Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS437 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS437 - *Keltepe Wind Farm Project , Turkey ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_10-07-09 to 28-02-10_v1.4.pdf) | 18/07/2019 | | | Other (Monitoring Report_2nd monitoring period_01-03-10 to 30-04-11_v4.0.pdf) | 18/07/2019 | | | Other (GS Passport_22-10-07.pdf) | 18/07/2019 | | | Other (Verification Report_2nd monitoring period_01-03-10 to 30-04-11_v2.0.pdf) | 18/07/2019 | | | Other (Verification Report_1st monitoring period_10-07-09 to 28-02-10_v1.0.pdf) | 18/07/2019 | | | Other (Monitoring Report_3rd monitoring period_01-05-11 to 30-04-12-v2.0.pdf) | 18/07/2019 | | | Other (Verification Report_3rd monitoring period_01-05-11 to 30-04-12-v3.0.pdf) | 18/07/2019 | | | Required (PDD_04-08-09.pdf) | 18/07/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_1st monitoring period_10-07-09 to 28-02-10_v1.4.pdf) | 27/02/2020 | | | Required ((1)Verification Report_1st monitoring period_10-07-09 to 28-02-10_v1.0.pdf) | 27/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_2nd monitoring period_01-03-10 to 30-04-11_v2.0.pdf) | 27/02/2020 | | | Required ((1)Monitoring Report_2nd monitoring period_01-03-10 to 30-04-11_v4.0.pdf) | 27/02/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V5.0-Deviation-Request-Form_Demirer 3_Keltepe.pdf) | 28/12/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V5.0-Deviation-Request-Form_Demirer 3_Keltepe_approved.pdf) | 18/12/2023 | | | Required (Final_ER calculations_Keltepe WPP_v0.2.xlsx) | 26/05/2023 | | | Other (Final_Ver Report_1050 Keltepe Wind_Öykü Yakupoğlu _v05_24-11-2023-CC.pdf) | 24/11/2023 | | | Other (SDG Impact Tool_Keltepe Wind_v2.xlsx) | 06/11/2023 | | | Other (Alize Keltepe WPP-Monitoring-Report_v06_wotc.pdf) | 24/11/2023 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Keltepe WPP_2022.pdf) | 29/12/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS437_GS4GG Design Renewal Review_Round I_14102022_SC (1).docx) | 14/10/2022 | | | Other (Final_SDG Impact Tool_Keltepe Wind_v3.xlsx) | 10/03/2023 | | | Other (Final_Val Report_880 Keltepe Wind_Seda Atabek_v04_17-12-2022.pdf) | 11/02/2023 | | | Other (Keltepe Wind Farm Project_PDD_v04_wotc.pdf) | 11/02/2023 | | | Other (Final_ER calculations_Keltepe Wind_v0.4.xlsx) | 10/03/2023 | | ###### Crediting Period Renewal no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_Keltepe WPP _v03.xlsx) | 14/06/2023 | | | Required (Final_CP Renewal Val Report_1097 Keltepe Wind_Seda Atabek_v04_18-10-2023_clean.pdf) | 19/10/2023 | | | Other (Keltepe Wind Farm Project_PDD_v05_wotc.pdf) | 19/10/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report of Keltepe WPP_2023_with colour.pdf) | 03/12/2024 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Keltepe WPP_2023.pdf) | 03/12/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 18/03/2025 - 01/04/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (Keltepe_SDG Impact Tool_v0.2.xlsx) | 28/02/2025 | | | Required (ER calculations_Keltepe WPP_09 05 2025.xlsx) | 09/05/2025 | | | Required (GS437_MR_Keltepe WPP -clean 08 08 2025.pdf) | 08/08/2025 | | | Required (GS437_FVR_Keltepe WPP - public_clean 08 08 2025.pdf) | 08/08/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Keltepe WPP_T-PerfCert_v3.0-Project-Annual-Report.pdf) | 12/11/2025 | |