Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS10987 Markdown Content: #### GS10987 - GivePower Kenya Solar Water Farms ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS10987 GivePower SS-PDD v1.pdf) | 08/02/2021 | | | Required (GS10987 GivePower SCR v1.pdf) | 08/02/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS10987 GivePower_Ex_Ante_calculations v3.xlsx) | 15/09/2021 | | | Other (GS10987 GivePower SCR v4_CL.pdf) | 08/10/2021 | | | Other (Validation report-TC.pdf) | 15/09/2021 | | | Other (GS10987 GivePower SS-PDD v9_CL.pdf) | 08/10/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL 1058 FVR (clean).pdf) | 03/08/2022 | | | Other (T-V4.0-Deviation-Request-Form_GS10987_v2_final_09.09.2021.pdf) | 15/09/2021 | | | Required (GS10987_ERs_v8.xlsx) | 03/08/2022 | | | Required (GS10987_MR_MP1_v8.1_CL.pdf) | 09/08/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS10987_Project_Annual_Report_2024.pdf) | 11/12/2024 | | | Other (DEV_664.pdf) | 27/11/2024 | | | Required (GS10987_MR_MP2_v7_CL.pdf) | 27/03/2025 | | | Other (DEV_663.pdf) | 27/11/2024 | | | Required (GS10987_ERs_MP2_v7.xlsx) | 27/03/2025 | | | Required (GivePower Kenya Solar Water Farms (GS10987) Final Verification Report (FVR) v7.pdf) | 27/03/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS10987_Project_Annual_Report_2025.pdf) | 22/12/2025 | |