Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS947 Markdown Content: #### GS947 - Killik Wind Power Plant ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)PDD 04.24.2012_v4.pdf) | 27/03/2020 | | | Other (GS947 Local Stakeholder Consultation Report Feedback 03.02.2011.pdf) | 27/03/2020 | | | Required (GS947 Validation Report 29.05.2012_v2.pdf) | 27/03/2020 | | | Other (GS947 Passport.pdf) | 27/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_10.13.2011 to 12.31.2013_v4.pdf) | 27/03/2020 | | | Other ((1)Verification Report_1st monitoring period_10.13.2011 to 12.31.2013.pdf) | 27/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_2nd monitoring period_28.08.2016 to 12.10.2018_v6.pdf) | 21/09/2020 | | | Required (Verification Report_2nd monitoring period_28.08.2016 to 12.10.2018_v3.1.pdf) | 21/09/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (853 Killik wind - GS - Ver to PDFinal_ER calculations_853 Killik Wind _v04_21-06-2023.xlsx) | 03/07/2023 | | | Other (Final_Ver Report_853 Killik Wind _Öykü Yakupoğlu_v03_03-04-2024_cln.pdf) | 04/04/2024 | | | Other (853 Killik wind - GS - Ver to PDFinal_MR_853 Killik Wind _v05_13-03-2024.pdf) | 04/04/2024 | | | Required (853 Killik wind - GS - Ver to PDFinal_MR_853 Killik Wind _v04_21-06-2023.pdf) | 03/07/2023 | | | Other (Annual Report 2021_Killik_WPP.pdf) | 29/12/2022 | | | Other (Final_ER calculations_853 Killik Wind _v05_13.03.2024.xlsx) | 04/04/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_Val Report_661 Killik wind_Seda Atabek_v05_28-08-2022.pdf) | 28/08/2022 | | | Other (Killik_WPP_PDD_v9_28.08.2022.pdf) | 28/08/2022 | | | Other (Final_ER calculations_661 Killik wind_v03_12-01-2022.xlsx) | 26/04/2022 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Killik_WPP_Annual_Report.pdf) | 31/12/2025 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 19/03/2026 - 02/04/2026 No Public Documents Found