Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS670 Markdown Content: #### GS670 - Kolar Biogas Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (PDD_12.22.2006_v3.pdf) | 01/06/2019 | | | Other (GS Passport_12.03.2015_v4.pdf) | 01/06/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_1st monitoring period_04.01.2012 to 31.12.2013_v1.1.pdf) | 15/09/2021 | | | Required (Monitoring Report_1st monitoring period_04.01.2012 to 31.12.2013_v2.pdf) | 15/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_2nd monitoring period_01.01.2014 to 31.12.2014_v2.1.pdf) | 15/09/2021 | | | Required (Monitoring Report_2nd monitoring period_01.01.2014 to 31.12.2014_v2.1.pdf) | 15/09/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_3rd monitoring period_01.01.2015 to 31.12.2015_v1.1.pdf) | 15/09/2021 | | | Other (Verification Report_3rd monitoring period_01.01.2015 to 31.12.2015_v4.pdf) | 15/09/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Verification report _Biogas project Uttarakhand India_PP_CleanMode.pdf) | 22/06/2022 | | | Required (CDM4058_Kolar 8 ER Spreadsheet_V01.1_280222.xlsx) | 08/04/2022 | | | Other (Verification Report_5th monitoring period_01.01.2017 to 31.12.2017_v2.1.pdf) | 15/09/2021 | | | Required (FVR_Kolar Biogas Project_Ver1.pdf) | 08/04/2022 | | | Other (GS3906 3rd Monitoring Report v1.2_24May2022.docx) | 22/06/2022 | | | Required (CDM4058_Kolar_MR7_V01.1_280222.pdf) | 08/04/2022 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS VR 670 Clean.pdf) | 22/01/2024 | | | Other (C1.6- 150618_ER Spreadsheet Kolar Project version 06(1).xlsx) | 22/01/2024 | | | Other (GS670_Kolar_MR8_V02.2_130923_.doc) | 24/11/2023 | | | Other (GS670_Project-Annual-Report-Form 2021_v1.pdf) | 15/12/2022 | | ###### Transition Review (GS CDM to GS VER) | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PreReview_V1.0-Transition-request-form-project GS670 v2.docx) | 12/11/2022 | |