Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS576 Markdown Content: #### GS576 - Kuyucak 25.6 MW Wind Farm Project, Turkey ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_11-11-10 to 31-12-11_v1.3.pdf) | 28/07/2019 | | | Other (Verification Report_1st monitoring period_11-11-10 to 31-12-11_v3.0.pdf) | 28/07/2019 | | | Other (Monitoring Report_2nd monitoring period_01-01-12 to 31-12-12_v1.1.pdf) | 28/07/2019 | | | Required (PDD 23.09.2010_v9.pdf) | 05/03/2020 | | | Other (Monitoring Report_3rd monitoring period_01-01-13 to 31-03-14_v1.1.pdf) | 28/07/2019 | | | Other (Verification Report_2nd monitoring period_01-01-12 to 31-12-12_v2.1.pdf) | 28/07/2019 | | | Other (Verification Report_3rd monitoring period_01-01-13 to 31-03-14_v1.1.pdf) | 28/07/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS Validation Report 20.10.2010.pdf) | 05/03/2020 | | | Other (GS Validation Report 06.05.2009.pdf) | 05/03/2020 | | | Required (PDD 13.09.2010_v8.pdf) | 05/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_1st monitoring period_11.11.2010 to 31.12.2011_v3.pdf) | 05/03/2020 | | | Required (Monitoring Report_1st monitoring period_11.11.2010 to 31.12.2011_v1.3.pdf) | 05/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report_2nd monitoring period_01.01.2012 to 31.12.2012_v1.1.pdf) | 05/03/2020 | | | Required (Verification Report_2nd monitoring period_01.01.2012 to 31.12.2012_v2.1.pdf) | 05/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_3rd monitoring period_01.01.2013 to 31.03.2014_v1.1.pdf) | 05/03/2020 | | | Required (Monitoring Report_3rd monitoring period_01.01.2013 to 31.03.2014_v1.1.pdf) | 05/03/2020 | | | Other (T-V5.0-Deviation-Request-Form_Demirer 3_Kuyucak[33].pdf) | 28/12/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_ 1049 Kuyucak Wind-VER_v0.3.xlsx) | 13/12/2023 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Kuyucak WPP_2022_final.pdf) | 29/12/2023 | | | Required (Final_MR_ 1049 Kuyucak Wind-VER_v0.4.pdf) | 13/12/2023 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Kuyucak WPP_2022.pdf) | 19/12/2023 | | | Required (Final_Ver Report_1049 Kuyucak Wind-VER_Khalid Mahmood_v04_13-12-2023.pdf) | 13/12/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_Kuyucak Wind_v0.3_26-09-2022.xlsx) | 08/10/2022 | | | Required (Final_Val Report_Kuyucak Wind_Seda Atabek_v02_07-10-2022.pdf) | 08/10/2022 | | | Required (Final_SDG Impact Tool_Kuyucak Wind_v0.3_26-09-2022.xlsx) | 08/10/2022 | | | Required (Final_PDD_Kuyucak Wind_v0.4_26-09-2022.pdf) | 08/10/2022 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Kuyucak SDG Impact Tool_v0.1(1).xlsx) | 24/07/2024 | | | Required (Final_ER calculations_1049 Kuyucak Wind-VER_v0.1_18-03-2024.xlsx) | 24/04/2024 | | | Other (Kuyucak 25.6 MW Wind Farm Project Monitoring Report_v03_wotc.pdf) | 24/07/2024 | | | Other (Final_Ver Report_1049 Kuyucak Wind-VER_Khalid Mahmood_v04_24-07-2024_cl.pdf) | 24/07/2024 | | | Other (Kuyucak SDG Impact Tool_v0.1.xlsx) | 24/04/2024 | | ###### Crediting Period Renewal no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Kuyucak 25.6 Wind Farm Project_PDD_v04_wotc.pdf) | 11/09/2024 | | | Other (GS_RCP REPORT_2024TQCE161_Kuyucak 25.6 MW WPP_Rev 3.0Aa_10092024.pdf) | 11/09/2024 | | | Other (Baseline Study_Kuyucak_v0.4(1).xlsx) | 11/09/2024 | | | Other (Kuyucak SDG Impact Tool_v0.3.xlsx) | 11/09/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 23/04/2025 - 07/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS576_FVR_Kuyucak WPP_clean_public 06 08 2025.pdf) | 06/08/2025 | | | Supporting (Kuyucak SDG Impact Tool_v0.3.xlsx) | 06/08/2025 | | | Required (GS576_MR_Kuyucak WPP_clean_18062025.pdf) | 18/06/2025 | | | Required (ER calculations_Kuyucak WPP_v0.3.xlsx) | 18/06/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Kuyucak WPP_T-PerfCert_v3.0-Project-Annual-Report_2024.pdf) | 12/11/2025 | |