Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4593 Markdown Content: #### GS4593 - Municipal Waste Composting in Dschang, Cameroon ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_09.08.18_v4.pdf) | 30/04/2021 | | ###### Internal Verification no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_01-03-17 to 31-12-19_v1.pdf.pdf) | 18/11/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Transition-Annex_GS 4593 Municipal Waste Composting in Dschang_Track_25 09 2019.docx) | 14/10/2019 | | ###### Internal Verification no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (2021_08_03 GS 4593_Confidential_MR.pdf) | 03/08/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 4593_Monitoring Report_V3_2023_03_14_clean.pdf) | 20/03/2023 | | | Required (CCIPL 1436_FVR_v2_20032023_Clean.pdf) | 20/03/2023 | | ###### Internal Verification no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 4593_VER_Cals_V3_22_09_2023.xlsx) | 22/09/2023 | | | Other (Final-Verification-Report-GS4593-MP4-Standalone-Cameroon.pdf) | 22/09/2023 | | | Required (GS 4593_Monitoring_Report_V3_22_09_2023.pdf) | 22/09/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 4593_Monitoring_Report_V3_22_09_2023(1).pdf) | 26/09/2023 | | | Required (Final-Verification-Report-GS4593-MP4-Standalone-Cameroon(1).pdf) | 26/09/2023 | | | Required (GS 4593_VER_Cals_V3_22_09_2023(1).xlsx) | 26/09/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 4593_V5-Monitoring-Report_Clean_28-03-2025_Clean.pdf) | 05/04/2025 | | | Required (GS 4593_Confidential_VER_Cals_2023_V1.xlsx) | 28/10/2024 | | | Required (GS4593 - FVR - Municipal Waste Composting in Dschan_ Clean.pdf) | 07/04/2025 | | | Other (Annual-Report_GS4593_vf.pdf) | 20/12/2023 | | ###### Performance Certification | Project no. 3 ##### Stakeholder Consultation 07/11/2025 - 21/11/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS 4593 SDG-Impact-tool.xlsx) | 29/10/2025 | | | Required (GS 4593_2024-Monitoring-Report_V5_Clean.pdf) | 02/02/2026 | | | Required (GS4593 - FVR - MWC_R1_Clean.pdf) | 02/02/2026 | | | Required (GS 4593 Confidential VER Cals 2024_V1 - R1.xlsx) | 18/12/2025 | |