Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6129 Markdown Content: #### GS6129 - GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 007 ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_10.04.2018_v4.PDF) | 04/07/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Transition Annex_01.03.2017_v2.2.pdf) | 04/07/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_01.03.2017 to 28.02.2018_v1.pdf) | 04/07/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01.07.2018 to 30.06.2019_v4.pdf) | 04/07/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_3rd monitoring period_01.07.2019 to 30.06.2020.pdf) | 04/07/2021 | | | Other (Monitoring Report_3rd monitoring period_01.07.2019 to 30.06.2020_v3.pdf) | 04/07/2021 | | ###### Internal Verification no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V5.0 GS 6129-Deviation-Request-Form.pdf) | 21/10/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_550.pdf) | 27/10/2023 | | | Required (VPA 007 (GS 6129)-(Fourth Term) V1.1-Monitoring-Report .docx) | 06/03/2024 | | | Other (CCIPL1733_FVR_29022024-track 03042024 - CL.pdf) | 04/04/2024 | | | Required (VPA 007 (GS6129) - Ex-Post Emission Reduction Calculation (Fourth Term).xlsx) | 20/12/2023 | | | Other (VPA 007-Project-Annual-Report-Form(1).pdf) | 19/12/2022 | |