Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1378 Markdown Content: #### GS1378 - Nanyang Danjiang River Solar Cooker Project Phase I ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (PDD_16.04.12_v3.pdf) | 02/10/2021 | | | Other (GS Passport_10.10.13_v5.pdf) | 02/10/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS1378 Transition Annex_30.04.2019.docx) | 10/10/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_02.05.12 to 30.11.13_v1.pdf) | 02/10/2021 | | | Other (Verification Report_1st monitoring period_02.05.12 to 30.11.13_v2.pdf) | 02/10/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_2nd monitoring period_01.12.13 to 31.03.15_v2.pdf) | 02/10/2021 | | | Other (Monitoring Report_2nd monitoring period_01.12.13 to 31.03.15_v3.pdf) | 02/10/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_3rd monitoring period_01.04.2016 to 31.12.2017.pdf) | 02/10/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_4th monitoring period_01.01.2018 to 30.11.2018_v2.doc) | 02/10/2021 | | | Other ((1)Monitoring Report_4th monitoring period_01.01.2018 to 30.11.2018_v3.doc) | 02/10/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_5th monitroing period_01.01.2018 to 30.11.2018_v1.pdf) | 02/10/2021 | | | Other (Monitoring Report_5th monitoring period_01.01.2018 to 30.11.2018_v1.pdf) | 02/10/2021 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Emission reduction calculationsheet I_202110156_V03.xlsx) | 18/10/2021 | | | Other (2021-10-15_GS-FVerR-Danjiang Solar Cooker Phase I 6th.pdf) | 18/10/2021 | | | Other (Monitoring Report_6th monitoring period_01.12.2018 to 30.04.2020_v2.pdf) | 02/10/2021 | | | Other (Verification Report_6th monitoring period_01.12.2018 to 30.04.2020_v1.pdf) | 02/10/2021 | | | Other (Nanyang Danjiang River Solar Cooker Project Phase I_MR-20211015_V03.docx) | 18/10/2021 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (20240408_GS-FVerR-Danjiang Solar Cooker Phase I 7th_V03 clean.pdf) | 09/04/2024 | | | Other (01.Nanyang Danjiang River Solar Cooker Project Phase I_MR-20240407-V04-Clean.pdf) | 24/04/2024 | | | Required (02. Emission reduction calculationsheet I_20231130_V02-GS.xlsx) | 07/12/2023 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (03. SDG-Impact-tool-Phase I-V01-20231116.xlsx) | 07/12/2023 | | | Required (01 PDD_Danjiang River Solar Cooker Project Phase I-V04-20240130-Clean.docx) | 31/01/2024 | | | Required (02.ER sheet-Phase I-V02-20231116.xlsx) | 07/12/2023 | | | Required (20240130_GS4GG Design Renew VAL FVR_Nanyang Solar Cooker I_clean.pdf) | 31/01/2024 | |