Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11415 Markdown Content: #### GS11415 - Nhon Hoa 2 Wind Power Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS11415_NH2_Stakeholder Consultation Report_V1.2_20220306.pdf) | 06/03/2022 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DR_NH2_V3.0_IQ_SDG-Impact-Tool_20231212.xlsx) | 27/12/2023 | | | Other (DR_NH2_IRR and ER_V3.0_20231212.xlsx) | 27/12/2023 | | | Other (DR_GS11415_PDD_Nhon Hoa 2_V3.0_20231212 (clean).pdf) | 27/12/2023 | | | Other (DEV_506.pdf) | 22/09/2023 | | | Other (DR_NH2_ER_V3.0_20231212.xlsx) | 27/12/2023 | | | Other (DR_Validation Report - Nhon Hoa 2 Wind Power Project (Clean).pdf) | 03/01/2024 | | | Other (DEV_507.pdf) | 22/09/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PR_NH2_V3.0_IQ_SDG-Impact-Tool_20231205.xlsx) | 27/12/2023 | | | Other (Verification Report - Nhon Hoa 2 Wind Power Project (clean) 150224.pdf) | 16/02/2024 | | | Required (PR_GS11415_Monitoring Report_Nhon Hoa 2_V2.1_20240121 clean2.pdf) | 14/02/2024 | | | Other (PR_NH2_ER_V3.0 (actual data w GEF 2021)_20231212.xlsx) | 27/12/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS11415_Project Annual Report_Nhon Hoa 2_12Nov2024_SIGNED.pdf) | 13/11/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 13/09/2025 - 26/09/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (GS11415_SDG-Impact-tool_Nhon Hoa 2 Wind Power Project_v1.4.xlsx) | 05/09/2025 | | | Required (GS11415_Nhon Hoa 2_Verif._ER_V1.5.xlsx) | 09/11/2025 | | | Required (GS _11415 Verification Report. clean- Public.pdf) | 09/11/2025 | | | Required (GS11415_Monitoring Report _Nhon Hoa 2 Wind Power Project_v1.5 (clean).pdf) | 09/11/2025 | |