Title: GSF Registry URL Source: https://registry.goldstandard.org/projects/details/1340 Markdown Content: ![Image 1: Gold Standard Foundation](blob:http://localhost/bb54a6fc31fea308f191f7c8b045db0c) ## Panasolar Photovoltaic Project GS ID 3556 Region Panama ![Image 2: Panasolar Photovoltaic Project](https://registry.goldstandard.org/assets/map-marker-d5f818d3.svg) Product ![Image 3: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER 26600 Issued 0 Retired certified SDG Impacts ![Image 4: Affordable and Clean Energy](https://registry.goldstandard.org/assets/7-affordable-and-clean-energy-3788308b.svg) ![Image 5: Decent Work and Economic Growth](https://registry.goldstandard.org/assets/8-decent-work-and-economic-growth-aee3eece.svg) ![Image 6: Climate Action](https://registry.goldstandard.org/assets/13-climate-action-50e8dac6.svg) Project Type ![Image 7: Solar Thermal - Electricity](https://registry.goldstandard.org/assets/solar-5424806a.svg) Solar Thermal - Electricity Status ![Image 8: Gold Standard Certified Project](https://registry.goldstandard.org/assets/gs-certified-35485fda.svg) Gold Standard Certified Project Project Attributes ![Image 9: Emission Reduction](https://registry.goldstandard.org/assets/carbon-reduction-c2dc02da.svg) Project Developer Panasolar Generation Standards Version Gold Standard for the Global Goals Annual Estimated Credits 10,322 Project Scale Small Scale Project Type Solar Thermal - Electricity Description The project consists of the construction, installation, operation and maintenance of a newly installed photovoltaic panels for the production of electricity through solar energy. This energy is captured by photovoltaic modules, with an installed capacity of 9.9 MW. These panels are placed on fixed structures anchored to the ground. The project activity will connect to the 34.5 KV substation in Llano Sanchez, via a covered transmission line known in Panama as “ecological cable" because it does not require for trees to be cut or trimmed where the lines passes. Once the line reaches the substation, it connects to the national electrical grid, know as Empresa de Trasmisio´n Ele´ctrica, S.A. (ETESA).The project has an expected lifetime of 25 years. Issuance List | Vintage | Quantity | Product | Issuance Date | Actions | | --- | --- | --- | --- | --- | | | | | | | | 2023 | 6306 | ![Image 10: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER | Sep 24, 2025 | [VIEW](https://registry.goldstandard.org/credit-blocks/details/530033) | | 2022 | 5910 | ![Image 11: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER | Sep 24, 2025 | [VIEW](https://registry.goldstandard.org/credit-blocks/details/530032) | | 2021 | 6352 | ![Image 12: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER | Sep 24, 2025 | [VIEW](https://registry.goldstandard.org/credit-blocks/details/530031) | | 2020 | 6852 | ![Image 13: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER | Sep 24, 2025 | [VIEW](https://registry.goldstandard.org/credit-blocks/details/530030) | | 2019 | 1180 | ![Image 14: VER](https://registry.goldstandard.org/assets/ver-742a7521.svg) VER | Sep 24, 2025 | [VIEW](https://registry.goldstandard.org/credit-blocks/details/530029) | 1-5 of 5 Retirements | Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions | | --- | --- | --- | --- | --- | --- | --- | --- | | | | | | | | | | | There are no credits. | 0 of 0