Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS481 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS481 - Qielong 1.2MW Hydro Power Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_1st monitoring period_05-04-2010 to 25-03-2013.pdf) | 15/09/2020 | | | Required (PDD_19-06-12.pdf) | 24/07/2019 | | | Other (Monitoring Report_1st monitoring period_05-04-2010 to 25-03-13_v2.pdf) | 15/09/2020 | | | Other (GS Passport_24-06-10.pdf) | 24/07/2019 | | ###### Internal Validation no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS Validation Report_07.10.2012_v3.pdf) | 29/02/2020 | | | Other (GS Validation Report_21.06.2012.pdf) | 29/02/2020 | | | Required (PDD_19-06-2012.pdf) | 15/09/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)PDD_19-06-2012.pdf) | 15/09/2020 | | | Required ((1)GS Validation Report_21.06.2012.pdf) | 29/02/2020 | | | Other (PDD_24-12-2010.pdf) | 15/09/2020 | | | Other ((1)GS Validation Report_07.10.2012_v3.pdf) | 29/02/2020 | | | Other ((1)GS Passport_24-06-10.pdf) | 29/02/2020 | | | Other (PDD_27-12-2011.pdf) | 15/09/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_05-04-2010 to 25-03-2013.pdf) | 15/09/2020 | | | Required ((1)Monitoring Report_1st monitoring period_05-04-2010 to 25-03-13_v2.pdf) | 15/09/2020 | |