Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS5830 Markdown Content: #### GS5830 - Renewable Power Project by Emami Power Ltd ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (PDD 24.04.2017_v1.pdf) | 02/04/2021 | | | Other (GS Passport 08.11.2017_v3.pdf) | 02/04/2021 | | | Other (T-V4.0-Deviation-Request-Form-GS 5830_v2_GSdecision(1).pdf) | 30/08/2024 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (01_2017_2617_GS_FVR.pdf) | 23/02/2022 | | | Other (GS5830 Transition Annex.pdf) | 02/04/2021 | | | Required (GS5830 Validation Report_12.08.2017_v2.pdf) | 02/04/2021 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Verification Report_1st monitoring period_03.08.2017 to 30.09.2019_v2.pdf) | 02/04/2021 | | | Other (T-V4.0-Deviation-Request-Form-GS 5830_v2_GSdecision.pdf) | 16/04/2021 | | | Required (Monitoring Report_1st monitoring period_03.08.2017 to 30.09.2019_v1.pdf) | 02/04/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (FVR_GS_5830-V02-cleanmode(1).pdf) | 19/04/2022 | | | Other (T-PerfCert_V1.1-Annual-Report 5830.pdf) | 06/06/2022 | | | Required (ER sheet_Emami GS_25012022.xlsx) | 02/02/2022 | | | Other (Monitoring Report _VER 03-cleanmode.pdf) | 06/06/2022 | | ###### Transition Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (101.5-Transition-Annex-_Emami_-GS5830.pdf) | 23/08/2021 | | | Other (Transition Request Form-GS 5830_cleanmode.pdf) | 27/12/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (MR_5830_04_Clean.pdf) | 02/05/2024 | | | Other (FVR_GS 5830_TQC 14223_Clean_Signed.pdf) | 02/05/2024 | | | Required (ER Sheet_5830_03.xlsx) | 02/02/2024 | | | Other (GS 5830 Annual report .pdf) | 02/02/2024 | | | Other (DEV_512.pdf) | 02/02/2024 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_739.pdf) | 29/07/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS5830_Estimated EF_ER and SDG sheet_23-07-24.xlsx) | 02/08/2024 | | | Other (GS5830_Estimated EF_ER and SDG sheet_23-07-24(1).xlsx) | 19/11/2024 | | | Other (GS 5830_ PDD_v4.0_CL.pdf) | 19/11/2024 | | | Other (GS _5830_SD_ImpactTool(1).xlsx) | 19/11/2024 | | | Required (GS _5830_SD_ImpactTool.xlsx) | 02/08/2024 | | | Other (FVR Emami GD_5830 GS_RCP_TQC_5624_v3.0_CL.pdf) | 19/11/2024 | | | Required (GS 5830_ PDD_v03.pdf) | 02/08/2024 | | | Required (FVR Emami GD_5830 GS_RCP_TQC_5624_01.08.2024_AR Sub..pdf) | 02/08/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 5830 Annual Report 2024.pdf) | 26/12/2025 | |