Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4817 Markdown Content: #### GS4817 - SÜTAS TIRE BIOGAS PLANT ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (PDD_SUTAS Tire Biogas Project_18.04.2024_track changes.docx) | 16/05/2024 | | | Required (Conf_Final_ER Calculations_622 Tire biogas_v04_16-11-2021.xlsx) | 22/11/2021 | | | Other (Final_Val Report_622 Tire biogas_Sandeep Kanda_v06_04-06-2024_clean.pdf) | 11/06/2024 | | | Other (DEV_705.pdf) | 24/06/2024 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_Sütaş_Tire_Biogas_Plant_2022.pdf) | 28/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS4817_T-PerfCert_v3.0-Project-Annual-Report_SutasTire.pdf) | 30/12/2024 | | ###### Performance Certification | Project no. 2 ##### Stakeholder Consultation 06/06/2025 - 20/06/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (430_V1.3_IQ_SDG-Impact-tool_SütasTireBiogas_v1_GS.xlsx) | 26/05/2025 | | | Required (Sütaş_Tire_MR_v6_ITR_2_GS.pdf) | 26/05/2025 | | | Required (FVR_GS.VER.24.70_SUTAS TIRE_PUB_CL_08-12-2025.pdf) | 08/12/2025 | | | Required (ER Calculations_Tire Biogas_VER_v6_GS.xlsx) | 26/05/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS4817_T-PerfCert_v3.0-Project-Annual-Report_SutasTire_2025.pdf) | 26/12/2025 | |