Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11136 Markdown Content: #### GS11136 - GS10959 VPA05 Safe Water Project in Rwanda V ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (10959Rwanda VPA Inclusion report_clean.pdf) | 05/09/2022 | | | Other (GS10959 VPA05 VPA DD_20220314.pdf) | 05/09/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS10959 Annual Report_20221231.docx) | 31/12/2022 | | | Required (Rwanda Verification Report-MP1_Iceberg clean(2).pdf) | 04/05/2023 | | | Required (1-SDG Outcomes Calculation Form-MP1st-Ver2-20221117(4).xlsx) | 12/01/2023 | | | Required (Monitoring-Report-Rwanda VPAs-MP1st-20022023cl(8).pdf) | 04/05/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring-Report-Rwanda VPAs-MP2nd_20240409tc.docx) | 03/05/2024 | | | Other (Final Verification Report_Rwanda_Clean.pdf) | 03/05/2024 | | | Other (16-SDG Outcomes Calculation Form-MP1st-Ver2-20221117.xlsx) | 03/05/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 11/04/2025 - 25/04/2025 No Public Documents Found ###### Performance Certification | Real or Regular VPAs no. 2 ##### Stakeholder Consultation 05/03/2026 - 19/03/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (1_SDG Outcomes Calculation Form-4th MP-Ver01_ Rwanda 20260119.xlsx) | 28/02/2026 | | | Required (Final Verification Report_Rwanda_V3.pdf) | 28/02/2026 | |