Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11861 Markdown Content: #### GS11861 - GS11638 GS11640 RVPA-1 SPOUTS Water Purifier Programme in Africa- WPS in Uganda by TASC- VPA 3 ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PreReview_V2.0-Stakeholder-Consultation-Report_Uganda.pdf) | 30/08/2022 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER cals VPA03-SPOUTS (Uganda)_ver1.0.xlsx) | 02/05/2023 | | | Required (SPOUTS_VPA 3 DD_v2.1_clean.pdf) | 15/06/2023 | | | Other (SPOUTS_LSC Report revised_latest.pdf) | 15/06/2023 | | | Required (SDG-Impact-Tool_GS11861-VPA03(1).xlsx) | 15/06/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS.VER.23.40_SPOUTS VPA 2and3_FVR_clean.pdf) | 12/11/2023 | | | Required (GS 11640 11861_MR_1st round SC clean.pdf) | 12/11/2023 | | | Required (SPOUTS_ER calculation sheet_1st round SC revised.xlsx) | 12/11/2023 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (VPA2-3 ER sheet_Spouts_MP2_v1.1_Public.xlsx) | 29/07/2024 | | | Required (MR_SPOUTS_VPA 2and3_MP2_R1_v1.3_clean.pdf) | 06/11/2024 | | | Required (GS11640 GS11861_FVR_v2.0_clean.pdf) | 06/11/2024 | | ###### Performance Certification | Real or Regular VPAs no. 1 ##### Stakeholder Consultation 11/09/2025 - 25/09/2025 No Public Documents Found