Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS905 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS905 - Sah Wind Power Plant ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (DEV_398 (1).pdf) | 10/10/2024 | | | Required (PDD_18-03-2013.pdf) | 22/09/2020 | | | Other (GS Passport.pdf) | 17/08/2019 | | | Required (GS905 Local Stakeholder Consultation Report_July2010.pdf) | 24/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS905 Validation Report 26.09.2013_v5.pdf) | 24/03/2020 | | | Required (GS905 Emission Reduction Calculations 16.01.2014.xlsx) | 24/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_15.11.2011 to 31.10.2013_v3.pdf) | 24/03/2020 | | | Other ((1)Verification Report_1st monitoring period_15.11.2011 to 31.10.2013_v1.1Aa.pdf) | 24/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Verification Report_2nd monitoring period_01.06.2015 to 31.05.2018.pdf) | 24/03/2020 | | | Other ((1)Monitoring Report_2nd monitoring period_01.06.2015 to 31.05.2018_v0.3.pdf) | 24/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS_VER_REP_Sah WPP_21XTMD8_Rev 3.0Aa_11112021.pdf) | 11/11/2021 | | | Other (Monitoring-Report of 3rd verification Sah WPP_v05_wtc.pdf) | 11/11/2021 | | | Required (Sah Wind Power Project 3rd Monitoring Period ER Calculations_v0.2.xls) | 09/08/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS_VER_REP_Sah WPP_22TQMD7_Rev 3.0Aa_27042023.pdf) | 30/04/2023 | | | Other (DEV_398.pdf) | 30/04/2023 | | | Required (Sah Wind Power Project 4th Monitoring Period ER Calculations_v02_clean.xlsx) | 06/12/2022 | | | Other (Monitoring-Report of 4th verification Sah WPP_v03_wotc.pdf) | 30/04/2023 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS_VER_REP_Sah WPP_24TQCE144_Rev 2.0Aa_31072024.pdf) | 01/08/2024 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Sah WPP_2022_final.pdf) | 16/12/2023 | | | Other (Monitoring-Report of 5th verification Sah WPP_v04_wotc.pdf) | 01/08/2024 | | | Required (Sah Wind Power Project 5th Monitoring Period ER Calculations_v01.xlsx) | 18/06/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_Sah_Wind_Power_Plant__06.11.2018_v.05.1_wtc_public(1).pdf) | 11/09/2024 | | | Required (GS905 Validation Report 24.10.2018_v4(1).pdf) | 11/09/2024 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 30/11/2025 - 12/12/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS905_Val Report_Şah WPP_Rev 1.1.pdf) | 12/11/2025 | | | Required (GS905_Baseline Study Sah Wind Power Plant_v0.2.xlsx) | 12/11/2025 | | | Required (GS905_PDD_Sah Wind Power Plant _v0.3.pdf) | 12/11/2025 | | | Supporting (GS905_SDG-Impact-tool_Sah Wind Power Plant_v0.1.xlsx) | 12/11/2025 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_Sah WPP_2024.pdf) | 03/12/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 19/03/2026 - 02/04/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS905_FVR_Şah WPP_Rev 1.1.pdf) | 03/03/2026 | | | Supporting (Sah WPP_430_V1.3_IQ_SDG-Impact-tool_v0.1.xlsx) | 03/03/2026 | | | Required (GS905_ER sheet_Şah WPP_v2.0.xlsx) | 03/03/2026 | | | Required (GS905_MR_Şah WPP_v3.0.pdf) | 03/03/2026 | |