Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS935 Published Time: Wed, 11 Feb 2026 08:48:26 GMT Markdown Content: #### GS935 - Samsun Landfill Gas to Energy Project, Turkey ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_2nd monitoring period_01-12-2012 to 31-08-2014_v3.pdf) | 22/09/2020 | | | Other (Monitoring Report_2nd monitoring period_01-12-2012 to 31-08-2014_v2.1.pdf) | 22/09/2020 | | | Other (Verification Report_1st monitoring period_09-02-2011 to 30-11-2012_v4.pdf) | 22/09/2020 | | | Required (PDD_13-04-2012.pdf) | 22/09/2020 | | | Other (Monitoring Report_1st monitoring period_09-02-2011 to 30-11-2012_v1.9.pdf) | 22/09/2020 | | | Other (GS Passport_13-04-2012.pdf) | 22/09/2020 | | | Required (GS935 Local Stakeholder Consultation Report 25.10.2010_v2.pdf) | 26/03/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_14-06-2019.pdf) | 22/09/2020 | | | Supporting (PDD_09-07-2019.pdf) | 22/09/2020 | | | Other (GS935 Validation Report 27.04.2012_v4.pdf) | 26/03/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)Monitoring Report_1st monitoring period_09.02.2011 to 30.11.2012_v1.9.pdf) | 26/03/2020 | | | Other ((1)Verification Report_1st monitoring period_09.02.2011 to 30.11.2012_rev4.pdf) | 26/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_13-05-2019.pdf) | 22/09/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Monitoring Report of Samsun WPP_3rd_verification_v0.7_01052020_wotc.pdf) | 14/05/2020 | | | Other (Final_Val Report_544 Samsun landfill_Sandeep Kanda_v03_02-12-2019.pdf) | 04/12/2019 | | | Other (Verification Repor_3rd monitoring period_16-04-2016 to 08-02-2018_v2.pdf) | 22/09/2020 | | | Other (Monitoring Report_3rd monitoring period_16-04-2016 to 08-02-2018_v8.pdf) | 22/09/2020 | | | Other (PDD_15-10-2019.pdf) | 22/09/2020 | | | Other (Final_Val Report_544 Samsun landfill_Sandeep Kanda_v3.1_22-01-2020.pdf) | 23/01/2020 | | | Other (PDD_Samsun LFG_v09_21.01.2020_wotc_CP renewal.pdf) | 23/01/2020 | | | Required (Final_Ver Report_543 Samsun landfill_Sandeep Kanda_v01.1_12-05-2020.pdf) | 14/05/2020 | | | Other (PDD_Samsun LFG_v09_21.01.2020_wtc_CP renewal.pdf) | 23/01/2020 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_Ver Report_743 Samsun landfill_Sandeep Kanda_v02.1_13-03-2022.pdf) | 14/03/2022 | | | Other (T-PerfCert_V1.1-Annual-Report of Samsun Landfill_2020.pdf) | 04/04/2022 | | | Other (T-PerfCert_V1.1-Annual-Report of Samsun Landfill_2019.pdf) | 04/04/2022 | | | Required (Monitoring-Report of 4th verification Samsun Landfill v0.7_wotc_20.12.2021.pdf) | 03/01/2022 | | | Other (T-V4.0-Deviation-Request-Form_Samsun Avdan_FINAL.pdf) | 11/04/2022 | | | Other (Monitoring-Report of 4th verification Samsun Landfill v0.9_wtc(1).pdf) | 18/04/2022 | | | Required (Final_ER Calculations_743 Samsun landfill_v06_16-11-2021.xlsx) | 03/01/2022 | | | Other (Monitoring-Report of 4th verification Samsun Landfill v0.9_wotc.pdf) | 04/04/2022 | | | Other (Final_ER Calculations_743 Samsun landfill_v07_25-02-2022(1).xlsx) | 18/04/2022 | | | Required (Final_Ver Report_743 Samsun landfill_Sandeep Kanda_v02_27-12-2021.doc) | 03/01/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Baseline Study v0.7_Samsun Avdan LFG_15.10.2019_CP renewal (1).xlsx) | 20/05/2024 | | | Required (Final_Val Report_544 Samsun landfill_Sandeep Kanda_v3.1_22-01-2020(1).pdf) | 16/05/2024 | | | Required (PDD_Samsun LFG_v09_21.01.2020_wotc_CP renewal(1).pdf) | 16/05/2024 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report of Samsun Landfill 2021.pdf) | 15/12/2022 | | | Other (T-PerfCert_V2.0-Project-Annual-Report of Samsun Landfill 2022.pdf) | 13/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 935 Annual-Report 2023.pdf) | 24/12/2024 | | ###### Design Certification Renewal | Project no. 1 ##### Stakeholder Consultation 15/02/2025 - 28/02/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_PDD_Samsun Landfill_v04_22-01-2025.pdf) | 30/01/2025 | | | Required (Final_ER Calculations_Samsun Landfill_v03_11-11-2024.xlsx) | 30/01/2025 | | | Supporting (Final_SDG Impact Tool_v02_11-11-2024.xlsx) | 30/01/2025 | | | Required (Final_Val Report_Samsun Landfill_v01.1_30-01-2025.pdf) | 31/01/2025 | | ###### Performance Certification | Project no. 3 ##### Stakeholder Consultation 30/04/2025 - 14/05/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS4GG Design Renewal Review_GS935_final_05022020.pdf) | 15/04/2025 | | | Required (Final_MR_Samsun Landfill_v04.docx) | 15/04/2025 | | | Required (Final_ER Calculations_Samsun landfill_v04.xlsx) | 15/04/2025 | | | Required (Final_Ver Report_Samsun LFG_v01.1_18-03-2025.pdf) | 19/04/2025 | | | Other (ER Calculations_Samsun landfill_simulation_old CP2 PDD_09022018_revised proof one.xlsx) | 15/04/2025 | | | Other (GS935 Annual Report_2023.pdf) | 15/04/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 935 Annual-Report 2024.pdf) | 15/12/2025 | |