Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS1074 Markdown Content: #### GS1074 - Santander and Las Tapias Renewable Energy Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)GS Passport_19.07.2012_v4.pdf) | 12/09/2021 | | | Other ((1)PDD_19.07.2012_v4.pdf) | 12/09/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Validation Report_16.11.2013_v4.pdf) | 12/09/2021 | | | Other (Transition Annex_02.04.2013_v1.docx) | 12/09/2021 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01.01.2017 to 31.12.2018_v4.pdf) | 12/09/2021 | | | Other (Verification Report_2nd monitoring period_01.01.2017 to 31.12.2018_v1.pdf) | 12/09/2021 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GSMR_Santander_3rd_01 01 2019_31 03 2020_v.07 Cleancopy.pdf) | 02/09/2024 | | | Other (Ver_GS_Santander_3rd_MP_020824_Clean_.pdf) | 05/08/2024 | | | Other (Project-Annual-Report-Santander and Las Tapias Renewable Energy_jan2021_dec2022 signed.pdf) | 22/12/2022 | | | Other (Project-Annual-Report-Santander and Las Tapias Renewable Energy_jan2019_dec2020 signed.pdf) | 22/12/2022 | | | Other (GSMR_Calculation_Santander_3rd_01 01 2019_31 03 2020_v.04.xlsx) | 07/06/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GSPDD_SantanderandLasTapias_v16_trackchange.docx) | 11/06/2021 | | | Other (GS.VAL.20.147_FRenR Santander_performance review.pdf) | 11/06/2021 | | | Other (Emission reductions Estimates Santander and Las tapias 3 Renewable Energy Project v12.xls) | 11/06/2021 | | | Other (GS.VAL.20.147_PRC_Santander_performance review.pdf) | 11/06/2021 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Project-Annual-Report-Santander and Las Tapias Renewable Energy_jan2023_dec2023.pdf) | 22/12/2023 | | | Other (GSMR_Calculation_Santander_4th_01 04 2020_31 12 2021_v.05.pdf) | 02/09/2024 | | | Other (Ver_GS_Santander_4th_MP_020824_Clean.pdf) | 05/08/2024 | | | Other (GSMR_Calculation_Santander_4th_01 04 2020_31 12 2021_v.06.xlsx) | 07/06/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Project-Annual-Report-GS1074_jan2024_dec2024.pdf) | 06/02/2025 | |