Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11336 Markdown Content: #### GS11336 - Shuangbaotai Animal Manure Management System GHG Mitigation Project in Guangxi Province ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (04 ER-Shuangbaotai AWMS GHG Mitigation Project in Guangxi Province-V02.xls) | 26/10/2021 | | | Other (03 PDD-Shuangbaotai AWMS GHG Mitigation Project in Guangxi Province-V02.docx) | 26/10/2021 | | | Other (05 IRR-Shuangbaotai AWMS GHG Mitigation Project in Guangxi Province.xls) | 01/09/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (SDG-Impact-Tool-20220624-V01.xlsx) | 28/06/2022 | | | Other (SCR-Shuangbaotai Guangxi_20220624_V02-clean.docx) | 28/06/2022 | | | Other (20221014_GS4GG Final VAL Report_Shuangbaitai Guangxi Swine-clean.pdf) | 17/10/2022 | | | Other (PDD-Shuangbaotai Guangxi_V05-clean.docx) | 17/10/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER-Shuangbaotai Guangxi-1st-20220624-V02.xlsx) | 28/06/2022 | | | Other (20221014_GS4GG Final VER Report_Shuangbaitai Guangxi Swine 1st_clean.pdf) | 17/10/2022 | | | Other (SDG-Impact-Tool-1st-20220624-V01.xlsx) | 28/06/2022 | | | Other (MR-Shuangbaotai Guangxi-1st-20220913-V03-clean.docx) | 16/09/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (ER-Shuangbaotai Guangxi-2nd-V02.xlsx) | 08/11/2023 | | | Required (20230808_GS4GG Final VER Report_Shuangbaitai Guangxi Swine 2nd_clean(1).pdf) | 08/11/2023 | | | Required (MR-Shuangbaotai Guangxi-2nd-V03-Clean(1).docx) | 08/11/2023 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report-Guangxi-GS11336-2024.docx) | 03/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report-GS 11336-Shuangbaotai Guangxi.pdf) | 15/12/2025 | |