Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11338 Markdown Content: #### GS11338 - Shuangbaotai Animal Manure Management System GHG Mitigation Project in Anhui Province ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (04 ER calculation sheet-Anhui Shuangbaotai.xls) | 09/09/2021 | | | Other (05 IRR sheet-Anhui Shuagnbaotai AMMS Project.xls) | 09/09/2021 | | | Other (03 PDD-Shuangbaotai Animal Manure Management System GHG Mitigation Project in Anhui Province-V02.docx) | 27/10/2021 | | | Required (Draft SCR-Shuangbaotai Anhui-GS11338.docx) | 27/10/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD-Shuangbaotai_Anhui-V05-clean.docx) | 09/02/2023 | | | Other (ER-Shuangbaotai_Anhui-PDD-V05-final.xlsx) | 09/02/2023 | | | Required (SDG-Impact-Tool-shuangbaotai_ Anhui-PDD-V02-20221017-clean.xlsx) | 17/10/2022 | | | Other (20230206_GS4GG Final VAL Report_Shuangbaitai Anhui Swine_clean.pdf) | 09/02/2023 | | | Other (NPV IRR-Shuangbaotai_Anhui-V02-20221017-clean.xlsx) | 17/10/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (MR-Shuangbaotai__Anhui-1st-V03-clean.docx) | 09/02/2023 | | | Other (20230206_GS4GG Final VER Report_Shuangbaitai Anhui Swine 1st_clean.pdf) | 09/02/2023 | | | Other (SDG-Impact-Tool-shuangbaotai_Anhui-1st-V02-20221017-clean.xlsx) | 17/10/2022 | | | Required (ER-Shuangbaotai_Anhui-1st-V02-20221017-clean.xlsx) | 17/10/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report-Shuangbaotai Anhui-GS11338.pdf) | 28/11/2023 | | | Other (Annual Report-Anhui-GS11338-2024.docx) | 03/12/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report-GS 11338-Shuangbaotai Anhui.docx) | 03/12/2025 | |