Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4264 Markdown Content: #### GS4264 - Silivri WPP ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_11.10.2016_v4.docx) | 15/05/2019 | | | Other (Monitoring Report_1st monitoring period_20.08.2014 to 31.03.2017_v5.doc) | 15/05/2019 | | | Other (Verification Report_1st monitoring period_20.08.2014 to 31.03.2017_v2.pdf) | 15/05/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (101.5-Transition-Annex-Silivri WPP_wtc_271219(2).pdf) | 26/12/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Verification Report_monitoring period_01-04-2017 to 31-07-2019_v3.pdf) | 19/11/2020 | | | Other (Monitoring Report_monitoring period_01-04-2017 to 31-07-2019_v5.pdf) | 19/11/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring-Report_Silivri_WPP_v6_24.10.2022.pdf) | 28/11/2022 | | | Other (Final_Ver Report_720 Silivri wind_Anıl Söyler_v02.1_24-11-2022.pdf) | 28/11/2022 | | | Other (Annual Report_Silivri WPP.pdf) | 25/01/2022 | | | Required (720 Silivri wind to PPFinal_ER Calculations_720 Silivri wind_v03_07-12-2021.xlsx) | 03/02/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-V4.0-Deviation-Request-Form _Silivri WPP_SC_FINAL(2).pdf) | 14/02/2023 | | | Required (Final_ER Calculations_721 Silivri wind_v02_23-06-2021.xls) | 12/08/2021 | | | Other (Final_Val Report_721 Silivri wind_Seda Atabek_v05_26-09-2023.pdf) | 27/09/2023 | | | Other (Final_PDD_721 Silivri wind_v10_06-09-2023.pdf) | 27/09/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report 2021_Silivri.pdf) | 29/12/2022 | | | Other (Final MR_Silivri_WPP_v5_03.02.2025_clean(1).pdf) | 17/02/2025 | | | Other (Final_ER calculations_857 Silivri Wind_v04_03-02-2025.xlsx) | 17/02/2025 | | | Other (Final_Ver Report_857 Silivri Wind_İrem Taşkıran_v03_17-02-2025_cl(1).pdf) | 17/02/2025 | | | Other (Silivri_WPP-Project-Annual-Report.pdf) | 26/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Silivri_WPP_Annual_Report.pdf) | 31/12/2025 | |