Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS655 Markdown Content: #### GS655 - Soma Wind Power Plant ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (PDD_04-07-12.pdf) | 02/08/2019 | | | Other (GS Passport_15-08-12.pdf) | 02/08/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Soma Validation Report dd 08 12 2011.pdf) | 18/03/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_13-08-10 to 30-06-12_v1.0.pdf) | 27/02/2020 | | | Required ((1)Monitoring Report_1st monitoring period_13-08-10 to 30-06-12_v2.0.pdf) | 27/02/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_2nd monitoring period_01-07-12 to 31-12-12_v2.0.pdf) | 27/02/2020 | | | Required ((1)Monitoring Report_2nd monitoring period_01-07-12 to 31-12-12_v4.0.pdf) | 27/02/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_ER calculations_1125 Soma Wind_v05_16-07-2024.xlsx) | 31/07/2024 | | | Other (SDG-Impact-tool_SomaWPP_V02_23-07-2024.xlsx) | 31/07/2024 | | | Other (Final_MR_ 1125 Soma Wind_v06_16-07-2024_clean.docx) | 31/07/2024 | | | Other (Final_Ver Report_1125 Soma Wind_Khalid Mahmood_v04_25-07-2024_cc.pdf) | 31/07/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Final_SDG Impact Tool_Soma WPP_v05_6102022.xlsx) | 01/11/2022 | | | Other (Final_ER Calculations_Soma WPP_v04_6102022.xlsx) | 01/11/2022 | | | Other (Final_PDD_Soma WPP_v09_18112022.pdf) | 23/11/2022 | | | Other (Final_Val Report_Soma WPP_v1.3_26-10-2022.pdf) | 01/11/2022 | | ###### Crediting Period Renewal no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (SDG Impact Tool_Soma WPP_v01.xlsx) | 12/08/2024 | | | Other (GS.VAL.23.74_FVR_V2.0_Clean.pdf) | 20/12/2024 | | | Other (Final_PDD_GS655_Soma Wind Power Plant_v07_16-12-20241_clean.pdf) | 20/12/2024 | | | Required (Final_ER Calculations_Soma WPP_v01_28062024.xlsx) | 12/08/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS 655 Soma WPP_Annual Report 2023.pdf) | 23/12/2024 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 04/01/2026 - 16/01/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_ER calculations_1125 Soma Wind_v01_08-09-2025.xlsx) | 15/12/2025 | | | Supporting (Final_SDG ImpactTool_Soma GS655_v03_26-03-2026.xlsx) | 27/03/2026 | | | Required (Verification Report_v05_GS 655 Soma Wind (4th MP)_Öykü Yakupoğlu_26-02-2026_clean.pdf) | 26/02/2026 | | | Required (Final_MR_ 1125 Soma Wind_v01_08-09-2025.pdf) | 15/12/2025 | | ###### Performance Certification | Project no. 2 ##### Stakeholder Consultation 04/01/2026 - 16/01/2026 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final_MR_ 1125 Soma Wind_v01_15-09-2025.pdf) | 15/12/2025 | | | Required (Final_ER calculations_1125 Soma Wind_v01_15-09-2025.xlsx) | 15/12/2025 | | | Required (Verification Report_v03_GS 655 Soma Wind (5th MP)_Signed.pdf) | 18/12/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Soma Annual Report 2024.pdf) | 23/12/2025 | |