Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS11333 Markdown Content: #### GS11333 - Swine Farm Animal Manure Management System GHG Mitigation Project in Hubei Province ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (04 ER-Swine Farm AWMS GHG Mitigation Project in Hubei Province.xls) | 06/09/2021 | | | Other (05 IRR-Swine Farm AWMS GHG Mitigation Project in Hubei Province.xls) | 06/09/2021 | | | Required (Draft SCR-Zhengbang Hubei GS11333.docx) | 27/10/2021 | | | Other (03 PDD-Swine Farm AWMS GHG Mitigation Project in Hubei Province-V02.docx) | 27/10/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (20230308_GS4GG Final VAL Report_Zhengbang Hubei Swine_clean.pdf) | 09/03/2023 | | | Required (Final ER-zhengbang Hubei-PDD-CTI-V03-Clean.xlsx) | 17/10/2022 | | | Other (PDD-Zhengbang Hubei-V06-CTI-Revised-Clean.docx) | 09/03/2023 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final ER-Zhengbang Hubei-1st-V02-CTI-Clean.xlsx) | 17/10/2022 | | | Other (20230308_GS4GG Final VER Report_Zhengbang Hubei Swine 1st_clean.pdf) | 09/03/2023 | | | Other (MR-Zhengbang Hubei-1st-V05-CTI-Revised-Clean.docx) | 09/03/2023 | | | Other (SDG-Impact-Tool-zhengbang Hubei-1st-V02-CTI-Clean.xlsx) | 17/10/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Annual Report-Zhengbang Hubei-GS11333.pdf) | 01/12/2023 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report-Zhengbang Hubei-GS11333.docx) | 10/12/2024 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual Report-Zhengbang Hubei-GS11333.docx) | 10/11/2025 | |