Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS7365 Markdown Content: #### GS7365 - GS1247 VPA 186 Lango Safe Water Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_06.08.2019_v5.pdf) | 23/07/2021 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS7365_VPA-DD v4 CLEAN.pdf) | 30/04/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_1st monitoring period_11.06.2019 to 31.03.2020_v5.pdf) | 23/07/2021 | | ###### Internal Verification no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Lango_MR_MP5 V3 CLEAN.pdf) | 13/07/2021 | | | Other (Lango Safe Water Project_ERs_MP5 GS CAPS V3.xlsx) | 13/07/2021 | | ###### Performance Review no. 5 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango_MR_MP5 V4 CLEAN.pdf) | 02/08/2021 | | | Required (Lango Safe Water Project_ERs_MP5 GS CAPS V4.xlsx) | 02/08/2021 | | ###### Performance Review no. 6 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Lango Project_MR_MP6 V8 CLEAN(6).pdf) | 29/06/2023 | | | Required (GS 1247_Lango Safe water Project_Revised FVR_GS review_Resubmission_Clean versi(1).pdf) | 17/07/2023 | | | Required (Lango Safe Water Project_ERs_MP6 (SWS caps applied) V4(3).xlsx) | 06/02/2023 | | | Other (Lango Uganda - T-PerfCert_V2.0-Project-Annual-Report-Form - Dec 2022 v2(6).pdf) | 29/06/2023 | | ###### Performance Review no. 7 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Final-Verification-Report-GS5106-GS5186-GS5197-GS6349-GS6351-GS7362-GS7366-MP7-Lango-Project v.2.doc(5).pdf) | 23/02/2024 | | | Required (Lango Safe Water Project_ERs_MP7 (SWS caps applied) V4(2).xlsx) | 23/02/2024 | | | Required (Lango Project_MR_MP7 V4 CLEAN(2).pdf) | 23/02/2024 | | | Other (Lango Uganda - T-PerfCert_V2.0-Project-Annual-Report-Form_2023.pdf) | 14/12/2023 | | ###### Performance Review no. 8 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango Project_MR_MP8 V5 CLEAN(6).docx) | 21/02/2025 | | | Required (Lango Safe Water Project_ERs_MP8 V3(6).xlsx) | 21/02/2025 | | | Required (Final_Ver Report_1205 Lango Safe Water_Report_Sanjay Kumar_v09_17032025R2 CLEAN(6).docx) | 19/03/2025 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Lango_Ex_Ante_calcs_Oct_2023_v2(1).xlsx) | 11/01/2024 | | | Required (Lango_Safe_Water_Project_VPA-DD_v2(1).pdf) | 11/01/2024 | |