Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS2679 Markdown Content: #### GS2679 - Ulan Phase II 10MWp Solar PV Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Monitoring Report_2nd monitoring period_01-11-2015 to 31-12-2016_v02.1.pdf) | 07/02/2020 | | | Required (PDD_12.06.2014_v3.pdf) | 28/05/2019 | | | Other (Verification Report_1st monitoring period_12.20.2013 to 10.31.2015.pdf) | 28/05/2019 | | | Other (GS Passport_12.06.2014_v3.pdf) | 28/05/2019 | | | Other (Monitoring Report_1st monitoring period_12.20.2013 to 10.31.2015_v3.pdf) | 28/05/2019 | | | Other (Monitoring Report_2nd monitoring period_01-11-2015 to 31-12-2016_v02.pdf) | 07/02/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_12.20.2013 to 10.31.2015.pdf) | 02/03/2020 | | | Required ((1)Monitoring Report_1st monitoring period_12.20.2013 to 10.31.2015_v3.pdf) | 02/03/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Monitoring Report_2nd monitoring period_01-11-2015 to 31-12-2016_v01.pdf) | 02/03/2020 | | | Required ((1)Verification Report_2nd monitoring period_01-11-2015 to 31-12-2016_v01.pdf) | 02/03/2020 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS-VCR-GS 2679_3rd monitoring period_01-01-2017 to 19-12-2020_V1.pdf) | 09/09/2022 | | | Required (GS2679_Monitoring Report_3rd monitoring period_01-01-2017 to 19-12-2020_V2.pdf) | 09/09/2022 | | | Required (GS2679_Monitoring Report_3rd monitoring period_01-01-2017 to 19-12-2020_V2.xlsx) | 09/09/2022 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS2679_Project-Annual-Report_01-01-2022 to 31-12-2022 V1.pdf) | 15/12/2023 | | | Other (GS2679_Project-Annual-Report_20-12-2020 to 31-12-2021 V1.pdf) | 23/12/2022 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (GS VR Renewal of the Crediting Period -Ulan Phase II 10MWp Solar PV Project-GS2679-CLEAN.pdf) | 10/05/2022 | | | Other (ER_GS2679_Ulan Phase II 20220507.xlsx) | 17/05/2022 | | | Other (Project-Design-Document-renew-GS2679_Ulan PhaseII solar_V2.1 20220507-clean.pdf) | 10/05/2022 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS2679-Project-Annual-Report-2023.pdf) | 27/01/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS2679-Project-Annual-Report-2024.pdf) | 20/11/2025 | |