Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS659 Markdown Content: #### GS659 - UPOIC Wastewater Treatment for Energy Generation, Krabi ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (PDD_21-02-2009.doc) | 27/01/2020 | | | Supporting (PDD_07.08.2015_v12.pdf) | 09/06/2019 | | | Other (DEV_354.pdf) | 24/10/2024 | | | Other (GS Passport_07.07.2016_v5.pdf) | 09/06/2019 | | | Other (GS Passport_09-12-2014.pdf) | 27/01/2020 | | | Other (Monitoring Report_monitoring period_18-10-2011 to 31-07-2014_v5.0.pdf) | 27/01/2020 | | | Other (Monitoring Report_monitoring period_06-05-2014 to 31-07-2014_v2.0.PDF) | 27/01/2020 | | | Other (Verification Report_monitoring period_18-10-2011 to 17-10-2021_v2.0.pdf) | 27/01/2020 | | | Other (Verification Report_monitoring period_18-10-2011 to 31-07-2014.pdf) | 05/10/2020 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required ((1)Verification Report_1st monitoring period_05.06.2014 to 07.31.2014_v2.pdf) | 27/02/2020 | | | Required ((1)Monitoring Report_[X] monitoring period_05.06.2014 to 07.31.2014_v3.pdf) | 27/02/2020 | |