Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS4221 Markdown Content: #### GS4221 - Vichada Climate Reforestation Project (PAZ) ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (3.2-PAZ15 Template-Local-Stakeholder-Consultation.pdf) | 18/08/2022 | | | Other (4.1 - PAZ15 Template - Additionality.pdf) | 18/08/2022 | | | Other (3.4 - PAZ15 Template - Sustainability Monitoring Plan.pdf) | 29/08/2022 | | | Required (PAZ15-GS PDD.pdf) | 18/08/2022 | | | Other (PDD_30-10-2015.pdf) | 15/11/2020 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (2.1 - PAZ15 Template - Key Project Information.pdf) | 07/06/2023 | | | Required (Vichada-Final_Goldstandard_V9_0_report-Final.doc_D2_TC.pdf) | 18/08/2022 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (101.5-Transition-Annex-Final_14042020(1).pdf) | 18/08/2022 | | | Required (Vichada-Final_Goldstandard_V9_0_report-Final.doc_D2_TC(1).pdf) | 18/08/2022 | | | Required (3.5 - Template - Sustainability Monitoring Plan_28112019(1).pdf) | 18/08/2022 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Vichada-Final_Goldstandard_V9_0_report-Final.doc_D2_TC(2).pdf) | 28/12/2023 | | | Other (101.5-Transition-Annex-Final_14042020(2).pdf) | 28/12/2023 | | | Required (3.5 - Template - Sustainability Monitoring Plan_28112019(2).pdf) | 28/12/2023 | | | Required (VICHADA CARBON MODEL 2019_final201119_2(1).xlsx) | 28/12/2023 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (Ex ante projections.xlsx) | 13/03/2024 | | | Other (430_V1.3_IQ_SDG-Impact-tool_VICH22.xlsx) | 13/03/2024 | | | Other (T-PreReview_V2.0-Stakeholder-Consultation-Report_2023.pdf) | 13/03/2024 | | | Required (CCIPL 1952_Final Performance Certification Report v4.0 CC.pdf) | 13/03/2024 | | | Required (Vichada23_Monitoring-Report_v3.pdf) | 13/03/2024 | | | Other (PDD23_updated_PerRev_GSID4221_v4.pdf) | 13/03/2024 | | ###### Performance Certification | Project no. 2 ##### Stakeholder Consultation 08/04/2025 - 22/04/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (T-PreReview_V2.0-Stakeholder-Consultation-Report_GS.pdf) | 12/03/2025 | | | Required (VICH22_PR2024_Inverbosques_130225-GS..xlsx) | 07/07/2025 | | | Supporting (430_V1.3_IQ_SDG-Impact-tool_VICH24_GS.xlsx) | 12/03/2025 | | | Other (Vichada-AR-Soil-Carbon-Tool_GS.xlsm) | 12/03/2025 | | | Required (Vichada24_Monitoring-Report_v4_0625.pdf) | 18/07/2025 | | | Supporting (Project-Design-Document_v6_0625.pdf) | 18/07/2025 | | | Other (Eligibility_Report_PR_2024.pdf) | 18/07/2025 | | | Required (CCIPL 2495_Final Performance Certification Report Public (CC).pdf) | 18/07/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (FM evaluation report_FSC C150409_2024.pdf) | 26/06/2025 | |