Title: Gold Standard Assurance URL Source: https://assurance-platform.goldstandard.org/project-documents/GS6598 Markdown Content: #### GS6598 - Water for Climate Rwanda Project ###### Preliminary Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (LSC_report_Water_for_Climate_Rwanda_v2.0_20181116_track.docx) | 04/09/2019 | | ###### Design Review | Document Name | Uploaded On | Download | | --- | --- | --- | | Supporting (CCIPL 651 Validation Report_rev VKS-08.02.2019(1).pdf) | 20/06/2024 | | | Supporting (LSC report_Water for Climate Rwanda_v3.1_20190530.docx) | 20/06/2024 | | | Required (CCIPL 651 Validation Report_rev VKS-08.02.2019.pdf) | 08/02/2019 | | ###### Performance Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (CCIPL 651 GS FVR VKS-08-05-2020-Clean.pdf) | 11/05/2020 | | | Other (20200504_GS6598_MR_clean.pdf) | 11/05/2020 | | ###### Performance Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (20211219_GS6598_MR_v3.2_clean.pdf) | 20/12/2021 | | | Required (20201203_GS6598_MR_v2.0_clean.pdf) | 16/12/2020 | | | Other (20211111_ER calculation_2nd issuance_Water for Climate Rwanda_v2.1.xlsx) | 13/11/2021 | | ###### Design Change Review no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other ((1)T-v1.0-Design-Change-Memo_GS6598_v.1.1.docx) | 05/05/2021 | | ###### Design Change Review no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-v1.1-Design-Change-Memo_GS6598_fNRB update_final_v2_clean.pdf) | 31/01/2022 | | | Other (Rwanda_fNRB Calculation Sheet_24 May 2021.xlsx) | 20/10/2021 | | | Required (ER calculations_Water for Climate Rwanda_v.3.1.xlsx) | 20/10/2021 | | | Required (20210830_PDD_Water for Climate Rwanda_v.5.4_clean.pdf) | 20/10/2021 | | | Other (CCIPL 936-Assessment of design chnage -WAR prject_Ver 2.0 (clean).pdf) | 31/01/2022 | | ###### Performance Review no. 3 | Document Name | Uploaded On | Download | | --- | --- | --- | | Other (T-PerfCert_V2.0-Project-Annual-Report-Form_GS6598-Dec. 2022_correct.pdf) | 09/12/2022 | | | Required (20221129_GS6598_MR_3rd issuance_v2.0_clean.pdf) | 22/02/2023 | | | Required (20221128_ER calculation_3rd issuance_Water for Climate Rwanda_v2.0.xlsx) | 22/02/2023 | | | Required (CCIPL1317_FVR_GS4GG_clean.pdf) | 22/02/2023 | | ###### Performance Review no. 4 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (CCIPL 2025 FVR_1.4_CC.pdf) | 07/10/2024 | | | Required (20230710_ER calculation_4th issuance_Water for Climate Rwanda_v0.5(1).xlsx) | 14/07/2024 | | | Required (GS6598_MR_4rd issuance_v10.0_clean.pdf) | 07/10/2024 | | | Required (CCIPL 2025 FVR_1.2_Clean.pdf) | 11/03/2024 | | | Required (GS6598_MR_4rd issuance_v7.0_clean.docx) | 11/03/2024 | | | Other (DEV_634.pdf) | 05/04/2024 | | ###### Crediting Period Renewal no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (c. Project-Design-Document_RCP_v1.0_clean.docx) | 11/07/2024 | | | Supporting (PDD_(Clean and TC).zip) | 13/06/2025 | | | Required (CCIPL 2109 FVR- TC.pdf) | 11/07/2024 | | | Required (c. Project-Design-Document_RCP_v0.7_clean(1).docx) | 05/03/2024 | | | Supporting (PDD_Clean and TC.zip) | 13/06/2025 | | | Required (SDG-Impact-tool_GS_6598(1).xlsx) | 05/03/2024 | | | Required (PDD_Renewal_ER_v0.3.xlsx) | 12/05/2025 | | | Required (CCIPL 2109 FVR(1).pdf) | 05/03/2024 | | ###### Annual Report no. 1 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (T-PerfCert_v3.0-Project-Annual-Report_GS6598_2024_v2.docx) | 17/03/2025 | | ###### Performance Certification | Project no. 1 ##### Stakeholder Consultation 18/07/2025 - 01/08/2025 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (GS6598_MR_5th issuance_v5.0_clean.pdf) | 25/09/2025 | | | Required (CCIPL 2548 FVR-1.5_Clean.pdf) | 25/09/2025 | | | Required (2024_ER calculation_5th issuance_Water for Climate Rwanda_v2..xlsx) | 25/09/2025 | | ###### Annual Report no. 2 | Document Name | Uploaded On | Download | | --- | --- | --- | | Required (Annual_Report_2025_WAR_signed.pdf) | 27/11/2025 | |