Vai al contenuto principale
avoidance Vintage 2008, 2012, 2013 Documentazione completa General Methodology v2.0

20 MW Enercon Wind farms (SAI) Pvt. Limited in Maharas…

CNN-a210e5 ↗

5.2 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
6.4

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Leakage is not addressed and baseline reassessment timing is not stated in available documents, weakening confidence in the baseline and net impact.

Transparency

verified A named VVB (Earthood Services Private Limited) and a defined monitoring period (2017-03-01 to 2020-12-13) are provided in the monitoring report (2022).

missing Major inconsistencies in claimed and verified ER figures across monitoring reports reduce MRV clarity and comparability.

Claim Safety

verified The project uses a widely applied CDM grid methodology (ACM0002 v11) with a stated grid emission factor (0.90641).

missing Over-crediting risk is elevated due to contradictory claimed/verified ER totals and missing leakage treatment; CORSIA/CCP status is not stated in available documents.

Documentation

verified Extraction confidence is high and multiple documents were used (7), including monitoring and validation reports.

missing Key governance/safeguard elements (FPIC, grievance mechanism, benefit sharing) are not evidenced in the extracted record.

Detailed Analysis

Integrity

Additionality appears reasonably supported because the VVB confirmed additionality using an investment test (validation/verification record as reflected in the extracted facts). The baseline is project-specific under ACM0002 (v11), but the timing of any baseline reassessment is not stated in available documents, which is a weakness for a long crediting period. Leakage is explicitly not addressed in the extracted record and no leakage deduction is stated, which reduces confidence that net ERs are conservatively estimated.

Transparency

The monitoring report (2022-08-30) provides a clear monitoring period (2017-03-01 to 2020-12-13) and identifies the VVB as Earthood Services Private Limited. However, transparency is undermined by inconsistent ER totals across monitoring reports, making it difficult to reconcile what was claimed versus what was verified over time. CORSIA eligibility and CCP status are not stated in available documents, limiting clarity for downstream buyers.

Claim Safety

Because this is an avoidance renewable electricity project using ACM0002 with a stated grid emission factor (0.90641), the core quantification approach is recognizable and auditable in principle. Nonetheless, the large contradictions in both claimed and verified ER totals across monitoring reports materially increase over-crediting and greenwashing risk. In addition, leakage is not addressed and no deduction is evidenced, and eligibility signals (CORSIA/CCP) are not stated in available documents, which increases uncertainty for claims.

Documentation

The extracted record draws on multiple documents (7) with high extraction confidence, supporting a moderate documentation score. Still, key non-carbon documentation elements are missing in the extracted record: FPIC is stated as not conducted, and safeguards, grievance mechanism, and benefit sharing are not evidenced. The crediting period is long and appears inconsistently stated across documents, which also points to documentation control issues.

Overall

I treated the most recent monitoring report (2022-08-30) as the primary reference for totals and dates because it is the latest and most likely to reflect consolidated issuance/verification outcomes; however, the presence of conflicting values in earlier monitoring reports (2017-05-03 and 2013-02-11) is a significant reliability concern. Specifically, verified ERs conflict (62,422 in 2022 vs 102,778 in 2017) and claimed ERs conflict (131,839 in 2022 vs 25,011 in 2013), which required a downward adjustment to transparency and claim safety. The crediting period also conflicts between the 2022 monitoring report (2010-12-14 to 2020-12-13) and the 2010 validation report (start date 2010-11-01 with end not stated); I privileged the later monitoring report for the end date but penalized documentation due to inconsistency.

Audit Analysis

This is a grid-connected wind project using a standard CDM methodology with additionality confirmed by the VVB, which supports basic environmental integrity. However, leakage is not addressed, safeguards/FPIC and grievance processes are absent in the extracted record, and there are major inconsistencies in claimed and verified emission reductions across monitoring reports that increase over-crediting and reliability risk.

Project Description

The 20 MW wind power project developed by WIND WORLD WIND FARMS (SAI) PVT LTD, formerly known as Enercon Wind Farms (SAI) Pvt. Limited, is a greenfield initiative located in Ahmednagar, Maharashtra. The project comprises 25 Enercon E-48 Wind Energy Converters (WECs), each with a capacity of 800 kW, designed to harness wind…

Red Flags

  • Large contradictions in both claimed and verified emission reductions across monitoring reports (e.g., verified 62,422 vs 102,778; claimed 131,839 vs 25,011), undermining confidence in credit quantities
  • Leakage is explicitly not addressed and no leakage deduction is stated in the extracted record
  • Safeguards are weakly documented: FPIC not conducted and no grievance mechanism found in the extracted record

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2008, 2012, 2013 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide a reconciled ER table across all monitoring periods showing claimed vs verified ERs, with references to each monitoring/verification report and registry issuance records to resolve contradictions.
  • Document and implement social safeguards: stakeholder engagement evidence, FPIC where applicable, a grievance mechanism, and benefit-sharing arrangements, and include these in publicly available reports.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk indicated

Leakage

Leakage not addressed; no deduction stated

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC/grievance not evidenced

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti