Vai al contenuto principale
avoidance Brazil Vintage 2022 Documentazione completa General Methodology v2.0

Angico energia

CT-197 ↗

1.5 / 10
Integrity
1.2
Transparency
0.8
Claim Safety
2.0
Documentation
2.4

Score Breakdown

Integrity

missing Additionality and baseline approach were not found in the extracted record (issuance record only).

inferred No material findings or corrective actions were reported, but this is not meaningful without the underlying verification/monitoring documentation.

Transparency

missing Key MRV fields (monitoring period, verified ERR, usage monitoring method) were not found in the extracted record.

missing Validator/verifier identity was not found, reducing traceability of assurance.

Claim Safety

missing No information found on CORSIA eligibility or CCP status, increasing uncertainty around downstream claims and double-claim risk.

missing No grid emission factor/baseline inputs found, increasing over-crediting risk for an avoidance renewable energy claim.

Documentation

missing Only one document of unknown type/source was used, and the document date was not found.

inferred Extraction confidence was medium, but the record remains incomplete for quality assessment.

Detailed Analysis

Integrity

The extracted record does not state any additionality test or confirmation by an independent verifier, so additionality robustness cannot be assessed from the issuance record. The baseline method and any reassessment timing were also not found, which is a major gap for an avoidance renewable energy project. No buffer pool or reversal information is provided (less central for avoidance projects), and leakage treatment was not found in the extracted record.

Transparency

The issuance record does not provide a monitoring period, verified emissions reductions/energy output, or the verifier’s name, so MRV transparency is very limited. No usage monitoring method or other operational monitoring details were found in the extracted record. While no material findings or corrective actions are listed, the absence of the underlying verification/monitoring reports prevents checking completeness.

Claim Safety

Key parameters that typically underpin avoidance claims—such as the grid emission factor and its vintage, and the baseline approach—were not found in the extracted record, elevating over-crediting risk. The record also does not state CORSIA eligibility or CCP status, leaving uncertainty about how credits might be marketed and whether double-claim risks are adequately managed. With no verified ERR value found, the strength of the quantified claim cannot be evaluated.

Documentation

Documentation is thin: only one evidence document is referenced and it is labeled as unknown, with no document date found. The minimum extraction confidence is medium, but the lack of core fields suggests either missing source documents or incomplete disclosure in the available record. With no verifier identified and no monitoring/verification report content available, independent assurance cannot be substantiated.

Overall

There are no contradictions flagged in the extracted record, so internal consistency cannot be challenged—but this is largely because most critical fields are missing. Given the absence of stated baseline, additionality, monitoring period, verifier identity, and verified ERR, the project scores low across integrity, transparency, and claim safety. Note: if documentation remains below 3.0, transparency would be capped by the gate rule in post-processing.

Audit Analysis

Only an issuance-type record was available, with most core quality fields (baseline, additionality, monitoring period, and verified generation/ERR) not found in the extracted record. With no stated methodology, MRV details, or eligibility/claims context, the risk of over-crediting and weak substantiation is high. No contradictions were detected, but the evidence base is too thin to support strong quality conclusions.

Project Description

Photovoltaic solar plant located in the municipality of Condado, in the state of Paraíba, Brazil Located in the municipality of Condado, in the state of Paraíba 27.2 MW of installed capacity and 31.59 MWp of peak power. 1st LER-2015. Authorization until 2051. PPA until July/2037 at R$397/MWh ¹ .

Red Flags

  • No baseline approach or methodology identified in the extracted record, limiting confidence that credits reflect real avoided emissions.
  • No monitoring period, verified output/ERR, or VVB information found, preventing assessment of MRV rigor and independent assurance.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2022 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report and verification/assurance statement showing the monitoring period, verified MWh/ERR, and the VVB/assurance provider identity.
  • Disclose the applied baseline/methodology (including grid emission factor source and year) and any leakage and safeguards procedures (FPIC, grievance mechanism).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Avoidance project; reversal provisions not evidenced

Leakage

Leakage treatment not found

Baseline

Baseline method not found

Safeguards

Safeguards/FPIC/grievance not found

Double-claim

Eligibility/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
CT-197 ↗

Registry Documents

Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti