Anthony and Edward Hofer Farms
Score Breakdown
Integrity
verified The monitoring report was verified by Control Union Malaysia for the 2024 monitoring period.
missing Additionality, baseline approach, leakage treatment, and permanence safeguards are not stated in available documents.
Transparency
verified A named VVB and a defined monitoring period are present in the verification report dated 2025-05-16.
missing Claimed versus verified issuance totals are not stated, and the extracted record lacks the monitoring and usage methods needed to assess MRV quality.
Claim Safety
missing The baseline method is not found, which weakens confidence in the emissions/removal claim.
missing No leakage justification, buffer pool, or CORSIA/CCP status is stated, leaving over-crediting and double-claim risk unresolved.
Documentation
verified Two source documents were used, including a verification report and issuance record.
missing The extraction confidence is only medium, and many key fields are missing rather than quantified.
Detailed Analysis
Integrity
The verification report names Control Union Malaysia and covers the 2024 monitoring period, which provides some independent oversight. However, the extracted record does not state any additionality test, baseline method, leakage deduction, buffer pool, or reversal events, so the core integrity case is weak. No material findings or corrective actions were reported, but that does not offset the large evidence gaps.
Transparency
Transparency is limited because the record does identify the VVB and the monitoring period, but it does not provide the claimed versus verified issuance totals. The monitoring method, usage monitoring method, and other registry completeness details are not found in the extracted record. With only medium extraction confidence, the documentation is incomplete for a robust public claim.
Claim Safety
Claim safety is low because the baseline method is not stated and leakage treatment is absent. The record also does not state CORSIA eligibility or CCP status, so dual-claim risk cannot be ruled out from the extracted documents. For a removal project, the lack of quantified permanence and leakage controls materially increases over-crediting concern.
Documentation
Documentation quality is modest at best: two documents were used, including a verification report dated 2025-05-16, but many critical fields are missing. The extraction confidence is medium, which suggests at least one source was not fully readable or complete. No corrective actions were required, but the absence of key quantified evidence keeps the documentation score low.
Overall
There are no explicit contradictions in the extracted record, so no document had to be privileged over another. The main issue is not conflicting evidence but missing evidence: additionality, baseline, leakage, permanence, and registry-claim details are largely unstated. Because integrity is very weak and documentation is incomplete, the overall assessment remains low.
Audit Analysis
The project has very limited documented support for core quality claims. The verification report shows a monitoring period and an independent VVB, but key elements such as additionality, baseline method, leakage treatment, and permanence safeguards are not stated in the extracted record. Overall, this creates a high uncertainty profile and weak claim safety.
Project Description
Credits issued: 703
Red Flags
- No additionality test or VVB-confirmed additionality is stated in the available documents.
- Baseline method, leakage deduction, buffer pool, and reversal history are not found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 703 | 0 | 703 | |
| Total | 703 | 0 | 703 |
Cosa migliorerebbe questo punteggio
- Provide the full validation and verification evidence for additionality, baseline setting, leakage assessment, and permanence controls, including any buffer pool or reversal monitoring.
- Disclose registry status details, verified issuance totals, and explicit CORSIA/CCP eligibility so double-claim risk can be assessed.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality evidence found
No reversal data or buffer pool stated
Leakage treatment not stated
Baseline method not stated
No safeguards documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →