Vai al contenuto principale
removal India Vintage 2025 Documentazione completa General Methodology v2.0

Biochar from agro-residue

CM-219401 ↗

4.6 / 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.3
Documentation
5.6

Score Breakdown

Integrity

verified The validation/verification process indicates additionality was confirmed by the VVB (CERES-CERT AG).

missing Baseline approach and leakage deduction are not clearly evidenced in the extracted record, and leakage is inconsistently treated across documents.

Transparency

verified A VVB is named (CERES-CERT AG) and a monitoring period is specified (2025-04-02 to 2025-05-20).

missing Key quantification outputs (claimed vs verified removals) are not found in the extracted record, limiting MRV transparency.

Claim Safety

verified No material findings or corrective actions are reported in the extracted record.

missing CORSIA/CCP status is not stated in available documents and leakage handling is unclear, increasing greenwashing/over-crediting risk.

Documentation

verified Multiple core documents are present (PDD, validation report, monitoring report).

inferred Extraction confidence is only medium and several critical fields (baseline, leakage deduction, safeguards details) are missing or not specific.

Detailed Analysis

Integrity

The extracted record indicates additionality was confirmed by the VVB (CERES-CERT AG), which supports integrity. However, the baseline method and any baseline reassessment timing are not found in the extracted record, making it hard to judge whether the counterfactual and crediting approach are robust. Leakage is a key weakness: the validation report indicates leakage was not addressed, and no leakage deduction percentage is provided, which is conservative-negative for a biochar/agro-residue supply chain context.

Transparency

Transparency is moderate because the VVB is identified and the monitoring period is clearly stated in the monitoring report (2025-04-02—2025-05-20). At the same time, the extracted record does not include total removals claimed or verified, preventing an external reader from reconciling issuance quantities to monitoring results. Several MRV-relevant elements (such as usage monitoring method) are also not found in the extracted record.

Claim Safety

Claim safety is constrained by missing eligibility/status signals: CORSIA eligibility and CCP status are not stated in available documents, so buyers cannot easily assess market-claim constraints. Over-crediting risk is elevated because baseline details are not found in the extracted record and leakage handling is unclear. While the extracted record shows no material findings or corrective actions, that alone does not resolve the quantification and boundary uncertainties.

Documentation

Documentation coverage is fair: the extracted record includes a PDD, validation report, and monitoring report (three documents total), and the VVB is named. However, extraction confidence is only medium, and several critical items (baseline method, leakage deduction, grievance mechanism, FPIC) are not found or not specified in the extracted record. This reduces confidence that the available documentation fully supports the credit quantification and safeguards narrative.

Overall

Overall quality is below average due to missing baseline and quantification details and an unresolved leakage inconsistency. The contradiction on leakage is material: the PDD (2025-05-15) describes leakage as deemed negligible, while the validation report (2025-05-15) states leakage was not addressed; the validation report is privileged because it reflects the independent assessor’s completeness check, so the project is scored as having a leakage evidence gap. With CORSIA/CCP status not stated and claimed/verified totals not found in the extracted record, the project carries elevated reputational and over-crediting risk.

Audit Analysis

The project has some credibility signals (VVB involvement and no reported material findings), but key integrity elements are missing or inconsistent in the extracted record. In particular, baseline details and leakage treatment are not clearly evidenced, which increases over-crediting risk for a biochar removal project.

Project Description

India is second largest producer of cotton in the world. The baseline scenario is burning of agro-residue once cotton is harvested, causing over 20 million tons of CO2 emissions annually. Using low tech flame curtain pyrolysis, the cotton plant biomass is converted into stable biochar in KonTikki kilns with 1000 years of permenance. Along with avoiding CO2 emissions, the project unlocks tremendous co-benefits by generating employment for women and men and socio-economic growth of rural communities. The biochar, which is an excellent organic fertilizer, is distributed back to the farmers for FREE to improve their soil health, thus improving the yield.

Red Flags

  • Leakage treatment is inconsistent across documents (PDD says negligible, validation report says not addressed).
  • Baseline approach and any reassessment timing are not found in the extracted record, limiting confidence in additionality and credit quantification.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2025 (non verificato).

Cosa migliorerebbe questo punteggio

  • Disclose the baseline approach (including key parameters and when it was last reassessed) and publish claimed vs verified removal totals for the monitoring period.
  • Provide a clear leakage assessment with justification and any quantified deduction (or evidence supporting negligible leakage), aligned across the PDD and validation report, and document safeguards implementation (FPIC and grievance mechanism).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality (test type not specified)

Permanence

Reversal/buffer provisions not evidenced in extracted record

Leakage

Leakage not consistently addressed; no deduction evidenced

Baseline

Baseline method not evidenced in extracted record

Safeguards

Safeguards mentioned but FPIC/grievance details not evidenced

Double-claim

CORSIA/CCP status not stated in available documents

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
CM-219401 ↗

Registry Documents

monitoring

pdd

validation

Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti