Vai al contenuto principale
Indonesia Solo marketplace General Methodology v2.0

Biodiversity and Community

CE-biodiversity-and-com

1.1 / 10
Integrity
1.5
Transparency
0.0
Claim Safety
2.0
Documentation
0.8

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and any permanence provisions were not found in the extracted record (no documents captured).

inferred No contradictions were detected, but this provides little assurance given the absence of underlying evidence.

Transparency

missing No VVB identity, monitoring period, or verification/monitoring results were found in the extracted record.

missing Registry/MRV completeness cannot be assessed because no evidence documents were captured.

Claim Safety

missing CORSIA/CCP status and any safeguards against over-crediting were not found in the extracted record.

inferred With no ERR figures or baseline parameters available, over-crediting risk cannot be bounded and is treated conservatively.

Documentation

missing Zero documents were used and no evidence documents were listed in the extracted record.

missing Low extraction confidence reduces reliability and suggests key information may be missing or unreadable.

Detailed Analysis

Integrity

No official documents were captured in the extracted record, so additionality testing, baseline methodology, leakage assessment, and any permanence/reversal provisions cannot be verified. With no monitoring or verification reports available, there is no evidence to confirm that credited emission reductions are real and additional. Given these evidence gaps, integrity is scored very low.

Transparency

Transparency is very limited because the extracted record contains no documents and therefore no information on the VVB, monitoring periods, MRV procedures, or verification outcomes. Public traceability (e.g., what was monitored, when, and by whom) cannot be established from the available record. This warrants a very low transparency score.

Claim Safety

Claim safety is weak by default because eligibility/status indicators (such as CORSIA eligibility or CCP approval) were not found in the extracted record, and there are no baseline or leakage parameters to evaluate over-crediting risk. With no ERR figures or verification results available, marketing claims would be difficult to substantiate. The score reflects high uncertainty and conservative treatment of missing evidence.

Documentation

Documentation quality is extremely poor: the extracted record lists zero evidence documents and indicates low extraction confidence. This combination suggests either missing documentation or unreadable sources, both of which materially undermine assessability. As a result, documentation is scored near the bottom.

Overall

There are no listed contradictions, but this is not meaningful because no underlying documents were captured to compare across sources. The overall score is driven by the absence of evidence across all key quality dimensions and the low extraction confidence. Note: under the stated gate rules, a documentation score below 3.0 would cap transparency after scoring.

Audit Analysis

The extracted record contains no usable project documentation, so core quality elements like additionality, baseline setting, leakage, and monitoring cannot be substantiated. With low extraction confidence and zero documents captured, the risk of over-crediting and weak claims is high by default.

Project Description

What it does Reducing deforestation is one of the biggest opportunities for cost efficient and immediate reduction of carbon emissions. This project is preserving 64,500 hectares of tropical peatland forest on the southern coast of Borneo, a rich ecosphere supporting flora, fauna and species including the endangered Bornean orangutan. The local government had previously

Red Flags

  • No project documents were available in the extracted record (0 documents used), preventing validation of additionality, baseline, leakage, or MRV.
  • Minimum extraction confidence is low, indicating at least one key source was poorly readable and increasing the risk of missing or misread critical details.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide the PDD and the latest validation/verification and monitoring reports so additionality, baseline setting, leakage, and MRV can be assessed.
  • Provide registry extracts (issuance/retirement records) and explicit statements on CORSIA eligibility and CCP status to reduce double-claim and greenwashing risk.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Permanence provisions not evidenced

Leakage

No leakage treatment found

Baseline

Baseline method not found

Safeguards

Safeguards not evidenced

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti