Vai al contenuto principale
CC avoidance United States Vintage 2022 Solo marketplace General Methodology v2.0

California Hydro Q4 2022 RECs

CC-20

1.6 / 10
Integrity
2.2
Transparency
0.8
Claim Safety
2.0
Documentation
0.8

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and any findings/corrective actions were not found in the extracted record due to missing documentation.

inferred Renewable energy avoidance claims can be robust, but this cannot be confirmed without the I-REC evidence pack and verification/issuance records.

Transparency

missing No public-facing MRV details (monitoring period, verifier, errors, or issuance data) were found in the extracted record.

missing Registry completeness cannot be assessed because no evidence documents were provided.

Claim Safety

missing Over-crediting/greenwashing risk cannot be screened because baseline and eligibility/claiming constraints were not found in the extracted record.

inferred The label 'RECs' suggests an attribute certificate context, but without I-REC issuance and ownership/retirement evidence, double-claim risk remains unresolved.

Documentation

missing Zero documents were used in extraction, so the project file is effectively non-auditable from the provided record.

missing Low extraction confidence reduces reliability even if documents existed outside the extracted record.

Detailed Analysis

Integrity

No official documents were available in the extracted record (0 documents), so the baseline method, additionality assessment, leakage approach, and any permanence/reversal provisions were not stated in available documents. With no verification or monitoring reports captured, there is no basis to confirm that credited MWh are additional or correctly quantified. Given these evidence gaps, integrity must be scored very low pending provision of the I-REC project registration and issuance documentation.

Transparency

Transparency is weak because the extracted record contains no evidence documents and therefore no monitoring period, metering/QA procedures, verifier identity, or error checks. The minimum extraction confidence is low, indicating that even if documents were present, key details may not have been reliably captured. As a result, the project cannot be independently reviewed from the provided record.

Claim Safety

Claim safety is low because the extracted record does not include any information on how environmental attributes are uniquely claimed (e.g., ownership chain and retirement) or any constraints on claims. No baseline or grid emission factor approach was found in the extracted record, so over-crediting risk cannot be evaluated. Without registry/retirement evidence, the risk of double claiming remains unresolved.

Documentation

Documentation is very poor: the extracted record lists no evidence documents and indicates 0 documents used. The low extraction confidence further reduces confidence that the record reflects the underlying project file. This prevents assessment of VVB independence, recency, and whether any corrective actions were required.

Overall

There are no contradictions listed, but the absence of any extracted documents combined with low extraction confidence creates a high uncertainty and reliability problem. Scores are therefore driven primarily by evidence gaps rather than identified technical flaws. Note: under the gate rules, a documentation score below 3.0 would cap transparency after scoring.

Audit Analysis

The extracted record contains no usable project documentation, so core quality elements (baseline, additionality, leakage, and MRV) cannot be substantiated. Given the low readability flag and zero documents captured, the risk of over-crediting or misrepresentation cannot be screened and should be treated as high until primary documents are provided.

Project Description

California Hydro offers RECs from multiple projects in the California region. Trinity Dam is an earth-fill dam on the Trinity River located about 7 miles (11 km) northeast of Weaverville, California in the United States. The dam was completed in the early 1960s as part of the federal Central Valley Project to provide irrigation water to the arid San Joaquin Valley. The Gianelli Power Plant, also known as the San Luis Power Plant, is a pumped-storage hydroelectric plant that is at the base of the San Luis Dam in California.

Red Flags

  • No project documents were available in the extracted record (0 documents), preventing validation of baseline, additionality, and monitoring.
  • Minimum extraction confidence is low, indicating at least one key document was poorly readable and increasing the risk of missing or incorrect facts.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2022 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the I-REC project registration record and issuance/retirement certificates for Q4 2022, including plant ID, production period, and beneficiary/retirement details.
  • Provide the metering and verification/assurance documentation (e.g., auditor/VVB statement, data QA/QC, and any non-conformities/corrective actions) to substantiate MRV and prevent double-claiming.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Avoidance type but not evidenced

Leakage

No leakage treatment found

Baseline

No baseline method found

Safeguards

No safeguards evidence found

Double-claim

Eligibility/retirement status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti