PUR removal Namibia Vintage 2024 Documentazione completa General Methodology v2.0

Farm Gai Kaisa 159

PUR-226049 ↗

4.0 / 10
Integrity
4.2
Transparency
3.6
Claim Safety
3.8
Documentation
4.8

Score Breakdown

Integrity

verified The methodology record indicates an investment additionality test and a quantified approach to leakage.

missing Permanence and leakage implementation are not verifiable from the extracted record (no buffer pool percentage, reversal information, or leakage deduction value).

Transparency

verified Safeguards elements are referenced (FPIC and a grievance mechanism).

missing Core MRV transparency is missing (no monitoring period, no claimed vs verified removals, no usage monitoring method, and no VVB identified).

Claim Safety

verified No material findings or corrective actions are reported in the extracted record.

missing Over-crediting risk cannot be screened because baseline is project-specific and key quantifications (verified removals and leakage deduction) are not found.

Documentation

verified Extraction confidence is high and two documents were used, with a recent methodology date (2024-02-01).

missing Evidence documents are not clearly identified (listed as "unknown"), and critical project/verification artifacts are not present in the extracted record.

Detailed Analysis

Integrity

The methodology record (dated 2024-02-01) indicates an investment additionality test and that leakage is treated via a quantified approach. However, the extracted record does not include the leakage deduction percentage, any buffer pool contribution, or any reversal events information, which are central to permanence and net-removal integrity for a removal project. The baseline is described as project-specific, and there is no information on when (or whether) the baseline was last reassessed.

Transparency

The extracted record lacks basic monitoring and verification transparency: no monitoring period is provided and neither claimed nor verified removal totals are available. The verifier (VVB) name is not found, and there is no indication in the extracted record that additionality was confirmed by a VVB. While FPIC and a grievance mechanism are mentioned, the absence of MRV details materially limits transparency.

Claim Safety

Because the extracted record does not provide verified removals, leakage deduction percentage, or monitoring methods, the risk of over-crediting cannot be meaningfully evaluated. The baseline is project-specific, which typically requires strong, well-documented justification to reduce greenwashing risk, but that justification is not available in the extracted record beyond the baseline type. CORSIA eligibility and CCP status are not stated in the extracted record, increasing uncertainty for downstream claims screening.

Documentation

Only two documents were used and the evidence list is not specific (shown as "unknown"), suggesting incomplete document coverage even though extraction confidence is high. The record includes a recent methodology version (2022 V3) and a methodology date (2024-02-01), but it does not include key project documents such as a monitoring report, verification statement, or registry issuance/retirement details. No material findings or corrective actions are reported, but without the underlying verification documentation this provides limited assurance.

Overall

No contradictions were identified in the extracted record, so scores are driven primarily by evidence gaps rather than conflicting data. The project shows some positive signals (investment additionality test; safeguards elements like FPIC and a grievance mechanism), but the absence of quantified and verified outcomes (monitoring period, verified removals, leakage deduction, permanence provisions, and VVB identity) materially reduces confidence. Note: if documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, overall would be capped at 6.0—these gates are not pre-applied here.

Audit Analysis

The extracted record suggests a project-specific baseline and an investment additionality test, with safeguards elements (FPIC and a grievance mechanism) mentioned. However, key MRV and crediting details (monitoring period, verified removals, leakage deduction value, buffer/reversal provisions, and verifier identity) are not found in the available documents, limiting confidence in credit quality claims.

Project Description

PUR-226049 — Biomass Removal

Red Flags

  • No verified removal volume or monitoring period found in the extracted record, preventing assessment of MRV performance.
  • Leakage is described as quantified, but the actual leakage deduction percentage is not provided in the extracted record.
  • No information found on buffer pool contribution or reversal events for a removal project, leaving permanence risk unclear.
  • Verifier (VVB) name and whether additionality was confirmed by a VVB are not found in the extracted record.

Credit Vintages Exhausted

Issued Retired Available
2024
11,141 11,141 0
2025
8,416 8,416 0
2026
1,396 1,396 0
Total 20,953 20,953 0

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report and verification statement showing the monitoring period, claimed vs verified removals, and any material findings/corrective actions, including the VVB name.
  • Disclose quantified leakage results (leakage deduction percentage and justification) and permanence provisions (buffer pool contribution and any reversal monitoring/response procedures).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Investment test stated; VVB confirmation not found

Permanence

Removal permanence provisions not evidenced (buffer/reversal info missing)

Leakage

Leakage said to be quantified; deduction value not found

Baseline

Project-specific baseline; reassessment timing not found

Safeguards

FPIC and grievance mechanism mentioned

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti