Grid Connected Wind Power Project by M/s. D. J. Malpan…

CNN-4849e7 ↗

5.6 / 10
Integrity
5.2
Transparency
6.0
Claim Safety
5.0
Documentation
6.8

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Leakage is inconsistently treated across monitoring reports and no leakage deduction is evidenced in the extracted record.

Transparency

verified A named VVB (Lloyd’s Register Quality Assurance Limited) and a defined monitoring period (2014-04-01 to 2016-09-30) are provided in the monitoring report (2017).

missing Claimed vs verified ERs differ materially and also conflict with an earlier monitoring report, undermining MRV transparency.

Claim Safety

verified The project is stated as not CORSIA-eligible, reducing some downstream double-claiming/eligibility confusion.

missing Over-crediting risk is elevated due to large claimed-versus-verified differences and contradictory ER figures across monitoring reports.

Documentation

verified Multiple document types are available (PDD, validation report, monitoring report, financial) and extraction confidence is high.

missing Some key quality elements are missing from the extracted record (baseline reassessment timing, leakage deduction, safeguards evidence).

Detailed Analysis

Integrity

Additionality appears reasonably supported: the validation/verification record indicates the VVB confirmed additionality using an investment test. The baseline approach is project-specific under AMS-I.D., and the grid emission factor is stated (0.9487 for 2011), but the timing of any baseline reassessment is not found in the extracted record. Leakage is a key weakness: the 2017 monitoring report indicates leakage was not addressed, while an earlier monitoring report (2014) describes leakage as deemed negligible, and no leakage deduction is evidenced.

Transparency

The monitoring period is clearly stated in the monitoring report dated 2017-02-16 (2014-04-01 to 2016-09-30), and the VVB is identified as Lloyd’s Register Quality Assurance Limited. However, the monitoring report shows a sizable difference between claimed and verified ERs (34,109 claimed vs 29,192 verified), and earlier monitoring documentation reports different totals, which reduces transparency and confidence in the MRV trail. No usage monitoring method is applicable/available for this grid electricity project in the extracted record, but core ER accounting inconsistencies remain the main transparency issue.

Claim Safety

The project is explicitly not CORSIA-eligible, which lowers the risk of CORSIA-related claim misuse, though CCP status is not found in the extracted record. Over-crediting/greenwashing risk is elevated because the 2017 monitoring report shows a material reduction from claimed to verified ERs, and both claimed and verified totals conflict with an earlier monitoring report (2014). Leakage treatment inconsistency (not addressed vs deemed negligible) further increases the risk that credited reductions are overstated or insufficiently justified.

Documentation

The extracted record includes multiple supporting documents (PDD, financial, validation report, monitoring report) with six documents used and high extraction confidence, which supports a solid documentation score. At the same time, several important items are not evidenced in the extracted record: baseline reassessment date, any leakage deduction percentage, buffer/pooling (not applicable for avoidance but still relevant to completeness), and safeguards documentation (FPIC, grievance mechanism, benefit sharing). No material findings or corrective actions are reported, which is positive, but the missing/contradictory content limits completeness.

Overall

Overall quality is moderate: additionality is VVB-confirmed and the project uses an established methodology, but MRV reliability is weakened by contradictions across monitoring reports and a large claimed-versus-verified gap. For contradictions, the more recent monitoring report (2017-02-16) is privileged for totals (29,192 verified; 34,109 claimed) because it is later-dated and likely reflects the latest verification outcome, but the existence of different totals in the earlier monitoring report (2014-08-07) is a material reliability concern and lowers scores. Leakage justification is also contradictory ("not addressed" in 2017 vs "deemed negligible" in 2014); the conservative interpretation is that leakage is not robustly treated, which reduces integrity and claim safety. Gate rules note: documentation is above 3.0 and integrity is above 4.0, so no deterministic caps would apply post-scoring.

Audit Analysis

This is a grid-connected wind project using a standard small-scale methodology (AMS-I.D.) with additionality confirmed by the VVB, which supports baseline credibility. However, key elements are weak or inconsistent across monitoring reports, including leakage treatment and large discrepancies between claimed and verified emission reductions, increasing over-crediting and data-reliability concerns. Social safeguards (FPIC, grievance mechanism, benefit sharing) are not evidenced in the extracted record.

Red Flags

  • Large gap between claimed and verified emission reductions in the 2017 monitoring report (34,109 claimed vs 29,192 verified), indicating over-crediting risk and/or MRV weaknesses.
  • Contradictory monitoring-report figures for both claimed and verified ERs across periods/documents, reducing confidence in reported outcomes.
  • Leakage treatment is inconsistent across monitoring reports (one says not addressed; another says deemed negligible), with no quantified deduction found.
  • Safeguards appear absent in the extracted record (no FPIC, no grievance mechanism, no benefit sharing described).

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2008, 2012, 2013 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide a clear, consistent leakage assessment in the monitoring/verification documentation (including whether leakage is negligible and why, and any applicable deduction).
  • Publish a reconciliation table across monitoring periods showing claimed vs verified ERs and explaining the differences between the 2014 and 2017 monitoring-report totals.
  • Document social safeguards: evidence of stakeholder consultation/FPIC where applicable, a functioning grievance mechanism, and any benefit-sharing arrangements.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk evidenced

Leakage

Inconsistent/insufficient leakage justification

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

No FPIC/grievance/benefit sharing evidenced

Double-claim

Not CORSIA-eligible; CCP status not found

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti