avoidance India Listed Credits Solo marketplace General Methodology v2.0

IND/REC/SLR/VER/18072025/00007

OG-687a2aae

1.6 / 10
Integrity
2.2
Transparency
0.8
Claim Safety
2.0
Documentation
0.8

Score Breakdown

Integrity

missing Baseline approach, additionality assessment, leakage treatment, and any findings/corrective actions are not found in the extracted record because no documents were available.

inferred Project is labeled as renewable energy avoidance, which typically has low permanence risk, but permanence provisions (e.g., buffer/reversal handling) are not evidenced in the extracted record.

Transparency

missing No VVB name, monitoring period, or verified vs claimed emission reductions are available in the extracted record.

missing Registry/public reporting completeness cannot be assessed because no evidence documents were captured.

Claim Safety

missing Over-crediting risk cannot be evaluated because baseline method, grid factors/FNRB approach, and usage/monitoring methods are not found in the extracted record.

inferred CORSIA/CCP status is not found in the extracted record, so double-claim/eligibility-related claim risk remains uncertain.

Documentation

missing Zero documents used and an empty evidence list indicate severe documentation gaps in the extracted record.

missing Low extraction confidence reduces reliability of any missing/absent information.

Detailed Analysis

Integrity

No baseline method, additionality test, leakage approach, or monitoring/verification outcomes are available because the extracted record contains no evidence documents. As a result, additionality robustness and baseline validity cannot be substantiated from the extracted record. While renewable energy avoidance projects generally have low reversal risk, permanence provisions (buffer pool, reversal events) are not found in the extracted record.

Transparency

Transparency is very weak because the extracted record provides no VVB identity, monitoring period, or claimed-versus-verified emission reductions. With no documents captured, MRV quality and registry completeness cannot be checked against primary sources. Low extraction confidence further increases the likelihood that key transparency information is missing or unreadable.

Claim Safety

Claim safety is low because the extracted record does not include the baseline method, grid emissions factor/FNRB approach, or any evidence of how generation/usage was monitored, all of which are central to avoiding over-crediting in renewable energy projects. CORSIA eligibility and CCP status are not found in the extracted record, leaving eligibility-related claim risk unresolved. The absence of any quantified verified results also prevents checking for inconsistencies in crediting claims.

Documentation

Documentation is severely insufficient: the extracted record shows zero documents used and an empty evidence list. The minimum extraction confidence is low, indicating poor readability for at least one key source and reducing confidence that missing items are truly absent. Without core documents (PDD, monitoring report, verification report), the project cannot be assessed reliably.

Overall

There are no listed contradictions in the extracted record, but the primary issue is the complete absence of captured documentation (0 documents) combined with low extraction confidence. Given these evidence gaps, scores are conservatively low across integrity, transparency, and claim safety because none of the required elements can be substantiated from official sources. Note: under the stated gate rules, a documentation score below 3.0 would cap transparency after scoring.

Audit Analysis

The extracted record contains no usable project documentation, so key integrity and MRV elements (baseline, additionality, leakage, and monitoring results) cannot be substantiated. With low extraction confidence and zero documents captured, the risk of over-crediting and weak claims is high due to lack of evidence.

Project Description

Verify on BlockChain IND/REC/SLR/VER/18072025/00007 Maharashtra, India Listed Credits - 100000 | Total Credits - 400000 | Partially | Transferable | More credits ? Renewable Energy Credits OG Score - 80 $ 8 per Credits Bid

Red Flags

  • No project documents were captured in the extracted record (0 documents used), preventing verification of baseline, additionality, leakage, and monitoring.
  • Minimum extraction confidence is low, indicating at least one key document was poorly readable and increasing the risk of missing or misread critical information.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide and link the core VCS documents (PDD, monitoring report(s), verification report(s), and VVB statements) so baseline, additionality, leakage, and verified ERs can be checked.
  • Improve document readability/extraction quality (higher-resolution scans or native PDFs) and include registry fields (VVB name, monitoring period, claimed vs verified ERs, CORSIA/CCP status) to enable a complete MRV and claim-risk assessment.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found in extracted record

Permanence

Avoidance type but no permanence provisions evidenced

Leakage

No leakage treatment found in extracted record

Baseline

No baseline method found in extracted record

Safeguards

No safeguards/FPIC/grievance evidence found

Double-claim

CORSIA/CCP status not found in extracted record

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti