Vai al contenuto principale
avoidance India Listed Credits Solo marketplace General Methodology v2.0

IND/REC/WND/GCC/18062025/00007

OG-68525803

1.4 / 10
Integrity
2.0
Transparency
0.5
Claim Safety
2.0
Documentation
0.8

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and any findings/corrective actions were not found in the extracted record due to missing documents

inferred The project is described as renewable energy avoidance, but without documents the baseline and additionality cannot be assessed

Transparency

missing No VVB name, monitoring period, or verified vs claimed ER figures were found in the extracted record

missing Registry/documentation completeness cannot be checked because no evidence documents were provided

Claim Safety

missing Over-crediting risk cannot be screened because baseline method, leakage justification, and any usage/operational monitoring details were not found

inferred CORSIA/CCP status was not found in the extracted record, so double-claim/eligibility risk cannot be ruled out

Documentation

missing Zero documents were used in extraction, leaving the assessment unsupported by primary sources

missing Low extraction confidence suggests document readability/quality issues and reduces reliability

Detailed Analysis

Integrity

No official documents were captured in the extracted record, so the baseline method, additionality test, leakage approach, and any buffer/reversal provisions were not stated in available documents. Because there is no verification/monitoring evidence in the record, it is not possible to confirm whether emission reductions are additional or conservatively quantified. Given these evidence gaps, integrity is scored very low by default.

Transparency

The extracted record includes no evidence documents and does not provide a VVB name, monitoring period, or any claimed-versus-verified emission reduction figures. With no monitoring/verification reports available, MRV quality and registry completeness cannot be assessed. Transparency is therefore scored very low.

Claim Safety

Without baseline and leakage documentation, the risk of over-crediting cannot be evaluated and must be treated conservatively. Eligibility indicators relevant to double-claim risk (such as CORSIA eligibility or CCP status) were not found in the extracted record. As a result, the project is not safe to claim against based on the available evidence.

Documentation

No documents were used in the extraction (0 total), and the minimum extraction confidence is low, indicating at least one key document was poorly readable. This combination implies major documentation incompleteness and unreliable extraction. Documentation is scored near the floor.

Overall

There are no contradictions listed in the extracted record. However, the absence of any captured project documents and the low extraction confidence dominate the assessment and drive all dimension scores downward due to inability to substantiate key quality criteria. Note: under the gate rules, a documentation score below 3.0 would cap transparency post-scoring.

Audit Analysis

The extracted record contains no usable project documentation, so core quality elements (baseline, additionality, leakage, and monitoring performance) cannot be validated. With low extraction confidence and zero documents captured, the risk of over-crediting and weak substantiation is high based on evidence gaps alone.

Project Description

Verify on BlockChain IND/REC/WND/GCC/18062025/00007 Tamil Nadu, India Listed Credits - 10000 | Total Credits - 10000 | Fully | Transferable | Renewable Energy Credits OG Score - 71 $ 6 per Credits Bid

Red Flags

  • No project documents were captured in the extracted record (0 documents), preventing validation of baseline, additionality, leakage, and MRV claims
  • Minimum extraction confidence is low, indicating at least one key document was poorly readable and increasing the risk of missing or incorrect facts

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide the PDD and the latest monitoring and verification reports (including VVB opinion) so baseline, additionality, leakage, and MRV can be validated
  • Provide registry and eligibility evidence (issuance/retirement records, CORSIA/CCP status, and any corresponding adjustment statements if relevant) to reduce double-claim and greenwashing risk

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Avoidance type but permanence provisions not evidenced

Leakage

No leakage treatment found

Baseline

No baseline method found

Safeguards

No safeguards evidence found

Double-claim

CORSIA/CCP status not evidenced

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti