Vai al contenuto principale
avoidance India Listed Credits Solo marketplace General Methodology v2.0

IND/REC/WND/VER/03012026/00021

OG-6958c11c

1.4 / 10
Integrity
2.0
Transparency
0.5
Claim Safety
2.0
Documentation
0.8

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and any findings/corrective actions were not found in the extracted record due to missing documents.

inferred The project is labeled as renewable energy avoidance, but without a PDD/monitoring/verification report the baseline and additionality cannot be assessed.

Transparency

missing No VVB name, monitoring period, or verified vs claimed ER information was found in the extracted record.

missing Registry/public disclosure completeness cannot be assessed because no evidence documents were captured.

Claim Safety

missing CORSIA/CCP status and double-claim controls were not found in the extracted record, increasing greenwashing and eligibility ambiguity.

missing Over-crediting risk cannot be screened because baseline and monitoring methods were not found in the extracted record.

Documentation

missing Zero documents were used/captured in the extracted record, indicating severe evidence gaps.

missing Low extraction confidence suggests document readability/ingestion issues that undermine reliability.

Detailed Analysis

Integrity

No PDD, monitoring report, or verification report was captured in the extracted record, so additionality testing, baseline method, leakage treatment, and any permanence-related provisions (if applicable) are not stated in available documents. Because the project is renewable energy avoidance, the integrity assessment hinges on baseline and grid emission factor treatment, but these are not available here. With these evidence gaps, integrity is scored very low and conservatively.

Transparency

The extracted record does not include the VVB name, monitoring period, or any comparison of claimed versus verified emission reductions, so MRV transparency cannot be evaluated. No evidence documents were captured, so public disclosure and registry completeness cannot be confirmed from the extracted record. Transparency is therefore scored very low.

Claim Safety

CORSIA eligibility and CCP status were not found in the extracted record, so buyers cannot rely on documented eligibility signals to reduce greenwashing risk. Baseline and monitoring details (including any grid factor approach) are also not available, preventing an over-crediting risk screen. Claim safety is scored low due to these unresolved uncertainties.

Documentation

The extracted record shows zero documents used and an empty evidence document list, indicating that the underlying project documentation was not available for assessment. Minimum extraction confidence is low, implying at least one key source was poorly readable and increasing the chance that critical information was missed. Documentation is scored extremely low; note that a documentation score below 3.0 would trigger a transparency cap under the stated gate rules.

Overall

There are no listed contradictions in the extracted record, but the absence of any captured documents (and low extraction confidence) is itself a major reliability issue. Because baseline, additionality, leakage, MRV results, and eligibility statuses are not stated in available documents, the overall score is driven down by pervasive evidence gaps rather than identified methodological flaws. Under the gate rules, the very low documentation score would cap transparency post-scoring.

Audit Analysis

The extracted record contains no usable project documentation beyond basic metadata, so core quality questions (additionality, baseline, leakage, and MRV) cannot be validated. With low extraction confidence and zero documents captured, the risk of over-crediting and weak substantiation is high from an analyst perspective.

Project Description

Verify on BlockChain IND/REC/WND/VER/03012026/00021 Tamil Nadu, India Listed Credits - 413 | Total Credits - 20000 | Partially | Transferable | More credits ? Renewable Energy Credits OG Score - 87 $ 7 per Credits Bid

Red Flags

  • No project documents were captured in the extracted record (0 documents), preventing validation of baseline, additionality, leakage, and monitoring.
  • Minimum extraction confidence is low, indicating at least one key source was poorly readable and increasing the risk of missing or misread critical details.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide and link the full VCS project documentation set (PDD, monitoring report(s), verification report(s), and issuance/registry records) so baseline, additionality, leakage, and MRV can be validated.
  • Publish key quantified parameters and results (monitoring period, claimed vs verified ERs, grid emission factor/baseline approach, leakage assessment, and any findings/corrective actions) in a machine-readable summary to reduce ambiguity.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Avoidance type but permanence provisions not evidenced

Leakage

No leakage treatment found

Baseline

Baseline method not found

Safeguards

No safeguards evidence found

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti