Vai al contenuto principale
VCS avoidance Fujian pilot ETS Vintage 2022 Registry: API_NO_STATUS Documentazione completa General Methodology v2.0

Project 9510 : Fiji Nadarivatu Hydropower Project

VCS-9510 ↗

4.9 / 10
Integrity
5.2
Transparency
4.3
Claim Safety
4.6
Documentation
5.4

Score Breakdown

Integrity

verified The validation report (2012-12-24) confirms additionality using an investment test and reports no material findings or corrective actions

missing Baseline and key parameters for quantification (grid emission factor year/value and reassessment timing) are not found in the extracted record

Transparency

verified A named VVB (Japan Consulting Institute) and core validation documentation (PDD and validation report) are available

missing Monitoring period and claimed/verified ER totals are not found in the extracted record, preventing reconciliation of results

Claim Safety

verified The project uses an established grid-connected renewable methodology (ACM0002 v12.1.0), which can support standardized accounting when fully disclosed

missing Over-crediting risk cannot be screened because grid emission factor details and ER totals are not found in the extracted record, and leakage handling is inconsistent

Documentation

verified Extraction confidence is high and the validation report is dated (2012-12-24) with no corrective actions required

missing Only two documents were available (PDD and validation report), and multiple key fields (monitoring period, ER totals, grid EF) are missing from the extracted record

Detailed Analysis

Integrity

The validation report (2012-12-24) confirms additionality via an investment test and reports no material findings and no corrective actions required, which supports basic integrity. The baseline approach is project-specific and key baseline quantification inputs (grid emission factor value/year and when the baseline was last reassessed) are not found in the extracted record, weakening confidence in baseline validity. Leakage is not consistently treated across documents, which introduces uncertainty about whether all relevant sources were considered.

Transparency

Transparency is limited because the extracted record does not include a monitoring period or any claimed versus verified emission reduction totals, so results cannot be independently reconciled. On the positive side, the VVB is identified as Japan Consulting Institute and both the PDD and validation report are available. Still, the absence of core MRV outputs in the extracted record materially reduces transparency.

Claim Safety

Claim safety is constrained by missing quantification details: the grid emission factor and ER totals are not found in the extracted record, making it difficult to assess over-crediting risk for an avoidance renewable project. The methodology (ACM0002 v12.1.0) is a recognized approach, but without disclosed parameter values and verification outcomes, marketing claims should be conservative. CORSIA eligibility and CCP status are not stated in the extracted record, adding uncertainty for downstream claims and labels.

Documentation

Documentation is moderate: the extracted record draws on two official documents (PDD and validation report) with high extraction confidence. The validation report is dated 2012-12-24 and indicates no corrective actions required, which supports completeness for the validation stage. However, key operational/monitoring documentation elements (monitoring period and ER totals) are not present in the extracted record, suggesting an incomplete document set for performance assessment.

Overall

Overall scoring is pulled down mainly by evidence gaps in MRV and quantification (monitoring period, grid emission factor details, and ER totals are not found in the extracted record). A specific contradiction exists on leakage: the validation report (2012-12-24) deems leakage negligible, while the PDD (2012-09-20) does not address leakage; the validation report is privileged because it is later and reflects third-party review, but the inconsistency still reduces confidence and slightly lowers integrity and claim-safety scores. Note: if documentation were to score below 3.0, transparency would be capped post-scoring; and if integrity were below 4.0, overall would be capped at 6.0 (gate rules applied after scoring).

Audit Analysis

This is a grid-connected renewable electricity project validated under ACM0002 with additionality confirmed via an investment test. However, key quantification and MRV elements (monitoring period, grid emission factor details, and verified ERs) are not present in the extracted record, and leakage treatment is inconsistent between the PDD and validation report. Overall, the project appears plausible but is hard to independently assess for over-crediting risk based on the available extracted documents.

Project Description

The Nadarivatu Hydropower Scheme was first identified in 1977 during a hydropower study. Details plans for the project were developed in 2002 and major construction began in 2009. The power station was commissioned on 7 September 2012 but an inauguration ceremony led by Prime Minister Frank Bainimarama was held a week later on 14 September. Documents: https://carbon.credit/api/getPubFile?id=4 https://carbon.credit/api/getPubFile?id=5 https://carbon.credit/api/getPubFile?id=6

Red Flags

  • Monitoring period and verified emission reductions are not stated in the extracted record, limiting MRV transparency and over-crediting checks
  • Leakage is treated inconsistently across documents (PDD does not address leakage; validation report deems it negligible)

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2022 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the monitoring report/verification report with the monitoring period, claimed and verified ER totals, and any findings to enable MRV reconciliation
  • Disclose baseline parameter details (grid emission factor value, year, and any reassessment) and explicitly align leakage treatment between the PDD and validation report

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Avoidance project; no reversal risk indicated

Leakage

Negligible claim but inconsistent across documents

Baseline

Project-specific baseline; key EF details not found

Safeguards

Safeguards mentioned but key elements not evidenced

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti