SAU/NCA/undefined/ICR/19072025/00011
OG-687b52b0
Score Breakdown
Integrity
missing Additionality, baseline approach, leakage treatment, and permanence provisions were not found in the extracted record (no documents available).
inferred Soil carbon projects typically require strong permanence and baseline evidence, but none is available here to evaluate.
Transparency
missing No monitoring/verification information or public-facing documentation was found in the extracted record (no documents available).
missing Registry/MRV fields (VVB, monitoring period, errors, methods) are not evidenced due to missing documents.
Claim Safety
missing Over-crediting risk cannot be screened because baseline and monitoring methods are not evidenced in the extracted record.
inferred Eligibility/labeling risks (e.g., CORSIA/CCP status) cannot be assessed from the extracted record.
Documentation
missing No evidence documents were provided/parsed (0 documents used).
missing Minimum extraction confidence is low, indicating poor readability of at least one key source.
Detailed Analysis
Integrity
No project design, monitoring, or verification documents were available in the extracted record (0 documents used), so additionality testing, baseline setting, leakage treatment, and permanence risk management (e.g., buffer pool, reversal procedures) cannot be confirmed. Given the project is classified as soil carbon, the absence of evidence is particularly material because crediting depends heavily on baseline assumptions and long-term carbon stock durability.
Transparency
The extracted record contains no VVB name, monitoring period, quantified results, or error checks because no documents were available. With minimum extraction confidence marked low, even if a source existed it was not reliably readable/usable, which further undermines transparency and MRV traceability.
Claim Safety
Without any stated baseline method, leakage justification/deduction, or monitoring approach in the extracted record, the risk of over-crediting cannot be bounded. No information was found on market-eligibility signals (such as CORSIA eligibility or CCP status), so buyers cannot reliably assess double-claim/labeling risk from the available evidence.
Documentation
The extracted record lists no evidence documents and indicates 0 documents were used, which is a critical documentation failure for quality assessment. The minimum extraction confidence is low, implying at least one key input was poorly readable, further reducing confidence in completeness and accuracy.
Overall
There are no listed contradictions in the extracted record, but this is not reassuring because there are also no underlying documents to cross-check. With 0 documents used and low extraction confidence, the project cannot be substantiated on any core quality dimension, so scores are conservatively very low. Note: per the gate rules, a documentation score below 3.0 would cap transparency post-scoring.
Audit Analysis
The extracted record contains no usable project documentation, so core quality attributes (additionality, baseline, leakage, permanence, and MRV) cannot be assessed. Given the soil carbon sector’s sensitivity to baseline and permanence assumptions, this level of evidence gap implies high over-crediting and reversal-risk uncertainty.
Project Description
Verify on BlockChain SAU/NCA/undefined/ICR/19072025/00011 Eastern Province, Saudi Arabia Listed Credits - 200 | Total Credits - 200 | Fully | Transferable | Nature-based Credits for Agriculture OG Score - 80 $ 25 per Credits Bid
Red Flags
- No project documents were available in the extracted record (0 documents used), preventing verification of additionality, baseline, leakage, permanence, or monitoring.
- Low extraction confidence indicates at least one key source was poorly readable, further reducing reliability of any potential underlying evidence.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide and/or publish the PDD, monitoring report(s), and verification/validation report(s) so additionality, baseline, leakage, permanence, and MRV can be independently assessed.
- Disclose permanence risk management (e.g., buffer contribution, reversal monitoring, and remediation procedures) and quantified leakage/baseline assumptions with VVB confirmation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality evidence found
Permanence provisions not evidenced
No leakage treatment found
No baseline method found
No safeguards evidence found
Eligibility/labels not evidenced
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →