Vai al contenuto principale
avoidance Alaska Documentazione completa General Methodology v2.0

The Last Frontier

CE-native-alaskans-savi

6.4 / 10
Integrity
6.6
Transparency
6.0
Claim Safety
6.8
Documentation
6.2

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB using a common-practice test (validation report).

missing Baseline is project-specific and the baseline reassessment timing is not stated in available documents.

Transparency

verified VVB is identified (SCS Global Services) and a defined monitoring period is provided (monitoring report 2019).

missing Claimed emission reductions are not stated in the extracted record, limiting MRV cross-checking against verified results.

Claim Safety

verified Leakage is explicitly quantified with a large deduction of 40%, which reduces over-crediting risk (monitoring report 2019).

missing CCP status is not stated in available documents, and safeguards-related contradictions increase greenwashing risk.

Documentation

verified Multiple document types are referenced (monitoring report and validation report) with high extraction confidence.

missing One key source is listed as “unknown,” and several social safeguard fields conflict across documents, reducing reliability.

Detailed Analysis

Integrity

The validation report indicates additionality was confirmed by the VVB using a common-practice test, which supports additionality robustness. The monitoring report (2019) applies a quantified leakage deduction of 40% and reports no reversal events, and the project contributes 18% to the buffer pool, which strengthens permanence risk management for an IFM project. Integrity is constrained by the project-specific baseline approach and the absence of a stated baseline reassessment date in the extracted record.

Transparency

Transparency is moderate: the monitoring period (2018-07-27 to 2019-07-26) and the verifier (SCS Global Services) are clearly identified in the extracted record. Verified emission reductions are provided (159,870), but the claimed amount is not stated in available documents, limiting an important consistency check. Some key monitoring-related fields (such as usage monitoring) are not applicable or not stated, which is acceptable for IFM but still reduces comparability across projects.

Claim Safety

Over-crediting risk is partially mitigated by the quantified leakage treatment (40% deduction) reported in the monitoring report (2019) and by the buffer pool contribution (18%). The project is stated as not CORSIA-eligible, which reduces certain double-claiming/dual-channel risks, but CCP status is not stated in available documents. Contradictions on FPIC, benefit sharing, safeguards, and grievance mechanism elevate reputational and greenwashing risk even if carbon accounting is otherwise structured.

Documentation

Documentation coverage is fair: three documents were used (including a monitoring report and validation report), and extraction confidence is high, suggesting the underlying files were readable. However, one evidence document is labeled “unknown,” and multiple key safeguard-related fields conflict between the monitoring report (2019) and an unknown document dated 2020-03-06, which undermines reliability. No material findings or corrective actions are reported, but the contradictions indicate the record is not fully coherent.

Overall

Overall quality is moderately strong on carbon accounting mechanics (VVB-confirmed additionality, quantified leakage, buffer pool contribution) but weakened by baseline uncertainty and inconsistent disclosures. For contradictions, the monitoring report (2019) is privileged over the unknown 2020-03-06 source because it is a clearly identified official project document type in the extracted record; accordingly, FPIC, benefit sharing, safeguards, and grievance mechanism are treated as not evidenced, and reversals are treated as none reported. These inconsistencies still reduce confidence and therefore lower transparency/documentation and increase claim-safety risk.

Audit Analysis

This ACR improved forest management avoidance project shows moderate-to-good carbon accounting integrity, with additionality confirmed by the VVB and a relatively high buffer pool contribution. However, the baseline is project-specific and the timing of baseline reassessment is not stated, and there are notable inconsistencies across documents on Indigenous/safeguards-related disclosures that reduce confidence.

Project Description

Why we chose this project: “The Alaskan environment is fragile and already under so much stress from climate change. It needs intervention, and with the financial assistance from carbon offset sales, small Alaska Native Communities can preserve, protect, and sustainably manage the forest for future of their families, instead of aggressively logging them. The

Red Flags

  • Contradictory statements across documents on FPIC, benefit sharing, safeguards, and grievance mechanism (monitoring report 2019 vs an unknown document dated 2020-03-06).
  • Baseline is project-specific and the baseline reassessment timing is not stated in available documents.
  • Total emission reductions claimed are not stated in the extracted record, limiting cross-checking against verified issuance.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Publish/identify the 2020-03-06 document and reconcile it with the monitoring report on FPIC, benefit sharing, safeguards, and grievance mechanism, with clear citations and dates.
  • Disclose the claimed emission reductions for the monitoring period and provide a clear baseline reassessment schedule/date to improve MRV cross-checking and baseline credibility.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

18% buffer pool; no reversals reported

Leakage

Leakage quantified with 40% deduction

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC/grievance/safeguards not evidenced and contradictory

Double-claim

Not CORSIA-eligible; no CCP status stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti