USA/NCA/FC/CAR/22072025/00018
OG-687f7e9c
Score Breakdown
Integrity
missing Additionality approach, baseline method, leakage treatment, and permanence controls were not found in the extracted record
inferred Soil carbon projects typically have material permanence and measurement uncertainty, but risk management details were not available to assess
Transparency
missing No VVB name, monitoring period, or verification/issuance figures were found in the extracted record
missing Registry/public-data completeness cannot be assessed because no evidence documents were captured
Claim Safety
missing No information found on CORSIA eligibility, CCP status, or safeguards against over-crediting (e.g., conservative baselines, leakage deductions)
inferred Without ERR claimed vs verified figures, the risk of over-issuance cannot be evaluated
Documentation
missing Zero documents were used in extraction, leaving major evidence gaps
missing Low extraction confidence suggests document quality/readability issues and reduces reliability
Detailed Analysis
Integrity
No official documents were captured in the extracted record, so the baseline approach, additionality demonstration, leakage assessment, and permanence risk management (e.g., buffer pool or reversal provisions) are not stated in available documents. For a soil carbon project, these elements are central to integrity, and their absence creates a high uncertainty profile. No information was found on material findings or corrective actions from validation/verification.
Transparency
Transparency is very limited because no evidence documents were captured and no verifier (VVB) details, monitoring period, or quantified monitoring/verification outcomes were found in the extracted record. As a result, MRV quality and registry completeness cannot be substantiated from the available materials. The low extraction confidence further reduces confidence that key disclosures were successfully captured.
Claim Safety
Claim safety is weak because the extracted record provides no basis to assess over-crediting controls (baseline conservativeness, leakage deductions, usage monitoring, or uncertainty deductions). No information was found on CORSIA eligibility or CCP status, so potential double-claim/market-eligibility signaling risks cannot be evaluated. With no claimed-versus-verified results available, the reliability of any listed credits cannot be checked.
Documentation
Documentation quality is very poor: the extracted record shows zero documents used and an overall low extraction confidence. This indicates either missing source files or unreadable/poorly parsed documents, which materially undermines the ability to verify any project claims. Recency, independence of verification, and the presence of corrective actions cannot be assessed without the underlying reports.
Overall
There are no contradictions reported, but this is not reassuring because the extracted record contains no documents at all, so inconsistencies could not be detected. With low extraction confidence and zero captured evidence, the prudent interpretation is that key quality determinants are unverified and the project carries high uncertainty. Note: the documentation score is below 3.0, so a transparency cap would apply under the stated gate rules (applied after scoring).
Audit Analysis
The extracted record contains no usable project documentation, so core quality elements (additionality, baseline, leakage, permanence controls, and MRV results) cannot be substantiated. Given the low readability flag and zero documents captured, this project should be treated as high uncertainty and high over-crediting/greenwashing risk until primary documents are reviewed.
Project Description
Verify on BlockChain USA/NCA/FC/CAR/22072025/00018 California, United States Listed Credits - 12000 | Total Credits - 12000 | Fully | Transferable | Nature-based Credits for Agriculture OG Score - 82 $ 8.5 per Credits Bid
Red Flags
- No project documents were captured in the extracted record (0 documents), preventing validation of baseline, additionality, leakage, and monitoring results
- Minimum extraction confidence is low, indicating at least one key document was poorly readable and increasing the risk of missing or incorrect facts
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide and extract the core CAR documents (PDD/project design, validation/verification reports, monitoring reports, and registry issuance/retirement records) so baseline, additionality, leakage, permanence, and MRV can be assessed
- Improve document readability/parse quality (higher extraction confidence) and include quantified results (monitoring period, ERR claimed vs verified, uncertainty/leakage deductions, reversals/buffer contributions) to enable a defensible quality evaluation
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality assessment found
Permanence controls not evidenced
Leakage treatment not evidenced
Baseline method not found
Safeguards not evidenced
Eligibility/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →