Wind power project in Maharashtra by TVS Energy Limite…

CNN-3d639a ↗

5.0 / 10
Integrity
5.6
Transparency
5.1
Claim Safety
4.2
Documentation
5.0

Score Breakdown

Integrity

verified The validation report confirms additionality using an investment test and was validated by Det Norske Veritas.

missing Baseline is project-specific and the timing of any baseline reassessment is not stated; leakage is not addressed in the extracted record.

Transparency

verified A named VVB (Det Norske Veritas) and a clearly stated monitoring/crediting period (2012-12-20 to 2019-12-19) are provided.

missing The extracted record shows a mismatch between claimed and verified ERs, and several MRV-relevant fields (e.g., grid EF vintage, leakage deduction) are not stated.

Claim Safety

missing The ER mismatch (verified higher than claimed) raises data reliability and over-crediting/claims risk unless explained in the verification/issuance context.

inferred CORSIA and CCP status are not stated in the available documents, increasing uncertainty around downstream claims and eligibility.

Documentation

verified Multiple document types are referenced (PDD and validation report) and extraction confidence is medium.

missing Key items are missing or inconsistent (safeguards contradiction; baseline reassessment and leakage quantification not found in the extracted record).

Detailed Analysis

Integrity

The validation report (2012-12-03) indicates additionality was assessed via an investment test and validated by Det Norske Veritas, which supports additionality robustness. The baseline is described as project-specific and uses ACM0002 (v12.3.0), but the timing of any baseline reassessment is not stated in the extracted record, weakening confidence that baseline parameters remained appropriate over time. Leakage is explicitly noted as not addressed and no leakage deduction is stated, which is a notable integrity gap even for grid-connected wind where leakage is often argued negligible but should still be justified in the monitoring/verification narrative.

Transparency

The extracted record provides a clear monitoring/crediting period (2012-12-20 — 2019-12-19) and identifies the VVB (Det Norske Veritas) in the validation report (2012-12-03). However, the total emission reductions show an internal inconsistency (claimed 338,666 vs verified 376,039) that is not explained in the extracted record, reducing transparency of the MRV trail. Several fields that would normally help users interpret the calculation (e.g., grid emission factor vintage/year and leakage deduction) are not stated in the available extracted data.

Claim Safety

The discrepancy where verified ERs exceed claimed ERs (376,039 vs 338,666) increases the risk that third parties misunderstand what was actually issued/eligible, and it should be reconciled against the verification statement and registry issuance records before making public claims. CORSIA eligibility and CCP status are not stated in the extracted record, so buyers cannot easily assess whether credits might be used in multiple claim contexts. The baseline is project-specific, and without a stated baseline reassessment date and leakage justification, there is elevated uncertainty around conservativeness.

Documentation

The evidence set includes a PDD and a validation report, with six documents used overall and medium extraction confidence, suggesting a moderate documentation base. Still, important elements are missing in the extracted record (baseline reassessment timing, leakage deduction/justification details, and several monitoring-method fields). The record also indicates FPIC was not conducted and no grievance mechanism is present, and safeguards documentation is inconsistent across sources, which reduces confidence in completeness.

Overall

Overall quality is moderate: additionality is VVB-confirmed in the validation report (2012-12-03), but baseline and leakage documentation gaps and the ER inconsistency materially weaken reliability for high-integrity claims. Contradiction addressed: safeguards are marked as mentioned in the PDD (2022-12-09) but not mentioned in another document (dated 2022-04-04, type unknown). I privilege the PDD value (safeguards mentioned) because it is a primary project document and is more recent, but I still downgrade documentation/transparency because the inconsistency suggests incomplete or uneven disclosure across the document set. Separately, the claimed vs verified ER mismatch is treated as a reliability issue and drives a downward adjustment to transparency and claim-safety until reconciled.

Audit Analysis

The project has a VVB-confirmed investment additionality assessment and no reported material findings or corrective actions in the available validation record. However, key integrity elements (baseline reassessment timing and leakage treatment) are missing or not addressed, and there is a material inconsistency between claimed and verified emission reductions that increases over-crediting risk.

Project Description

Green Infra BTV Limited 4 (TVS Energy) develops a 25.5 MW wind farm in the state of Maharashtra, India. The project comprises 17 Wind Electric Generators (WEGs), each with a capacity of 1500 kW. These turbines generate clean and renewable electricity, which is supplied to the Indian grid, supporting the transition toward a…

Red Flags

  • Verified emission reductions (376,039) exceed claimed emission reductions (338,666), indicating a reporting inconsistency that should be reconciled before relying on the numbers.
  • Leakage is not addressed and no leakage deduction is stated in the extracted record.
  • Safeguards documentation is inconsistent across documents, and FPIC and a grievance mechanism are stated as not present.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2008, 2012, 2013 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the verification/issuance documentation that reconciles the claimed vs verified ER totals and clearly links to registry issuance/retirement records.
  • Add explicit leakage assessment/justification (even if 0%) and disclose baseline parameter update/reassessment timing (including grid EF vintage/year) for the monitoring period.
  • Document and implement a grievance mechanism and clarify safeguards/consultation evidence (including whether any stakeholder engagement equivalent to FPIC was conducted).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk indicated

Leakage

Leakage not addressed

Baseline

Project-specific baseline; reassessment not stated

Safeguards

No FPIC or grievance mechanism; inconsistent safeguards disclosure

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti