Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

JCR-FO-001 — Forestry

Official title, in Japanese: “森林経営活動”

About this methodology

Forest owners in Japan carry out planned forest work, such as thinning and planting, under a forest management plan. The method credits the extra CO2 taken up by the trees above and below ground, compared with forests where that management does not continue.

Version
6.6 · source ·
Status
Active at J-Credit Scheme · source ·
Climate outcome
CO2 removals
Activity
Forestry
Official page
japancredit.go.jp ·

How our current method reads projects of this type

Versions of the official text these rules cover: JCR-FO-001 v6.3, JCR-FO v1.0

What CarbonMeld reads

  • Integrity shown

    Additionality: the methodology itself gives it in two cases (FO-001 Ver.6.3 付記1, p. 20). In the first, the project plans no final felling in the certification period. In the second, the project plans to replant every stand where it plans a final felling. In other cases, the project must show that its revenue in the period is lower than its costs. CarbonMeld reads this in the documents.CM-F-JCR-FO001-ADDITIONALITY

    Link
  • shown

    Permanence and reversals: the methodology sets rules for it (FO-001 Ver.6.3 適用条件5, p. 2). CarbonMeld reads it in the project's documents.CM-F-JCR-FO001-PERMANENCE-REVERSAL

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Our current method does not check how realistic the baseline scenario of the project is. An example is the harvest level that the project compares with.CM-F-JCR-FO001-BASELINE-REALISM

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

  • Grid emission factorCM-N-GRID-EF
  • LeakageCM-N-LEAKAGE
  • Buffer poolCM-N-BUFFER
  • Fraction of non-renewable biomass (fNRB)CM-N-FNRB
  • Usage rate of the devicesCM-N-USAGE
  • No legal requirement for the activityCM-N-REGULATORY-SURPLUS
  • Durability of the storageCM-N-DURABILITY-MEASUREMENT
  • Sustainability of the feedstockCM-N-FEEDSTOCK-SUSTAINABILITY
  • Tracking of the end useCM-N-END-USE-TRACKING
  • Social safeguards and consent of communities (FPIC)CM-N-SAFEGUARDS-FPIC

The general rules apply as well. Read the general rules.

Projects using JCR-FO-001

Browse 300 published projects using JCR-FO-001, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects are rated. Open a project to view its registry details and the analysis available for that project.

← All leaderboards · Full database