Additionality: the project must show it with a test (Arrêté du 5 septembre 2025 art. 2, p. 2). CarbonMeld reads the test in the documents.CM-F-LABEL-BAS-CARBONE-FOREST-ADDITIONALITY
LBC-GFSC — Gestion Forestière à Stock Continu
About this methodology
Owners of French forests that could be harvested manage them to keep a high, continuous stock of standing trees over the project. The method credits the carbon kept in the trees and in wood products, compared with full or partial harvest followed by regrowth.
- Issued by
- Label Bas-Carbone (LBC) · issuer's site
- Status
- Active at Label bas-carbone · source ·
- Climate outcome
- Emission reductions and CO2 removals
- Activity
- Forestry
- Official page
- label-bas-carbone.ecologie.gouv.fr
How our current method reads projects of this type
Versions of the official text these rules cover: Arrêté du 5 septembre 2025 (référentiel du Label bas carbone), Méthode Plantation de vergers (23 Oct 2020), Méthode Haies v2 (08/06/2021), Méthode boisement v3 (02/09/2025), Méthode boisement v2 (27/07/2020), Méthode reconstitution de peuplements forestiers dégradés v2 (27/07/2020)
What CarbonMeld reads
- Integrity shown
- shown
Leakage: the methodology sets rules for it (Arrêté du 5 septembre 2025 art. 9, p. 6). CarbonMeld reads it in the project's documents. The Boisement, Reconstitution, Plantation de vergers and Haies methods set no leakage term.CM-F-LABEL-BAS-CARBONE-FOREST-LEAKAGE
- shown
Permanence and reversals: the methodology sets rules for it (Boisement v3 §1, p. 7). CarbonMeld reads it in the project's documents.CM-F-LABEL-BAS-CARBONE-FOREST-PERMANENCE-REVERSAL
Deductions that can apply
- Integrity deduction −1.5
Forest, wetland, peat, grassland and soil carbon: if the documents read do not address leakage, CarbonMeld lowers integrity by 1.5 and shows a red flag. Outside REDD+ and reforestation, the gate applies only where the methodology requires a leakage assessment. At the listing stage, the gate does not apply when the programme's listing form has no section on leakage.CM-G-LEAKAGE-NOT-ADDRESSED
since engine 72 Link
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- Grid emission factorCM-N-GRID-EF
- Buffer poolCM-N-BUFFER
- Fraction of non-renewable biomass (fNRB)CM-N-FNRB
- Usage rate of the devicesCM-N-USAGE
- Durability of the storageCM-N-DURABILITY-MEASUREMENT
- Sustainability of the feedstockCM-N-FEEDSTOCK-SUSTAINABILITY
- Tracking of the end useCM-N-END-USE-TRACKING
- Social safeguards and consent of communities (FPIC)CM-N-SAFEGUARDS-FPIC
The general rules apply as well. Read the general rules.
Projects using LBC-GFSC
Browse 35 published projects using LBC-GFSC, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects are rated. Open a project to view its registry details and the analysis available for that project.
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
