Additionality: the methodology itself gives it (CSC v1.0 §2.2, p. 18). The project needs no test of its own. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-ADDITIONALITY
ONCRA-PROTOCOL-CONSTRUCTION — Construction-stored Carbon Protocol (Biobased Buildings)
About this methodology
Biobased construction materials and buildings store carbon. The protocol sets how the carbon stored in a building is assessed, documented and verified.
- Issued by
- Oncra · issuer's site
- Version
- 1.0 · source ·
- Climate outcome
- CO2 removals
- Activity
- Biomass storage
- Official page
- climatecleanup.notion.site ·
How our current method reads projects of this type
Versions of the official text these rules cover: 1.0 (31-03-2024)
What CarbonMeld reads
- Integrity shown
- shown
Durability of the storage: the methodology sets rules for it (CSC v1.0, p. 3). CarbonMeld reads it in the project's documents. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-DURABILITY-MEASUREMENT
- shown
Sustainability of the feedstock: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-FEEDSTOCK-SUSTAINABILITY
- shown
Tracking of the end use: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-END-USE-TRACKING
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it in some cases (CSC v1.0, p. 17). Our current method does not assess it. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-LEAKAGE
- not assessed
Permanence and reversals: the methodology sets rules for it (CSC v1.0 §2.3, p. 19). Our current method does not assess it. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-PERMANENCE-REVERSAL
- not assessed
No legal requirement for the activity: the methodology sets rules for it (CSC v1.0 §2.2, p. 18). Our current method does not assess it. CM-F-ONCRA-CONSTRUCTION-STORED-CARBON-REGULATORY-SURPLUS
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-BUFFERBuffer pool
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-SAFEGUARDS-FPICSocial safeguards and consent of communities (FPIC)
The general rules apply as well. Read the general rules.
Projects using ONCRA-PROTOCOL-CONSTRUCTION
Browse 16 published projects using ONCRA-PROTOCOL-CONSTRUCTION, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects are rated. Open a project to view its registry details and the analysis available for that project.
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
- Analysis: Analysis pending
