Bundled Wind power project in Jaisalmer (Rajasthan in…
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB in the validation documentation.
missing Leakage is not addressed and baseline reassessment timing is not stated in the extracted record.
Transparency
verified Multiple core documents are available (PDD, validation report, monitoring report, issuance) with a defined monitoring period (2006-07-01 to 2011-08-31).
missing Verified emission reductions are not found in the extracted record, limiting MRV transparency and cross-checking.
Claim Safety
verified The project is explicitly not CORSIA-eligible, lowering aviation-claim channel risk.
missing Contradictions in key quantification inputs (grid emission factor) and missing verified ER figures increase over-crediting/greenwashing risk.
Documentation
verified Document coverage is relatively strong (11 documents used) and extraction confidence is high.
missing Safeguards and stakeholder protection elements (FPIC, grievance mechanism) are not evidenced in the extracted record.
Detailed Analysis
Integrity
The validation documentation indicates additionality was confirmed by the VVB, but the specific additionality test is inconsistent across validation reports (one cites a barrier test while another cites an investment test), which weakens robustness. The monitoring report (2011) does not address leakage, and no leakage deduction is stated in the extracted record, leaving an important integrity element unresolved. The baseline is described as project-specific, and the timing of any baseline reassessment is not stated in the available documents, increasing the risk that baseline assumptions became outdated over the long crediting period.
Transparency
The extracted record includes key document types (PDD, validation report, monitoring report, issuance) and clearly states the monitoring period (2006-07-01 to 2011-08-31) and claimed ERs (374,562). However, the verified ER total is not found in the extracted record, preventing a direct claimed-versus-verified comparison. A major transparency concern is the internal inconsistency in the grid emission factor reported across monitoring reports, which makes it harder for third parties to reproduce calculations confidently.
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of high-profile aviation claims. Still, over-crediting risk is elevated because a key quantification parameter (grid emission factor) appears with two incompatible magnitudes in monitoring documentation, consistent with a potential unit/decimal error. In addition, the absence of a verified ER figure in the extracted record and the lack of leakage treatment make it harder to substantiate conservative crediting to external claimants.
Documentation
Documentation coverage is relatively strong, with 11 documents used and high extraction confidence, and the monitoring report (2011) reports no material findings and no corrective actions required. However, safeguards are inconsistently evidenced: the monitoring report indicates safeguards are not mentioned, FPIC is not evidenced, and no grievance mechanism is evidenced in the extracted record. This reduces confidence that social safeguards were systematically documented and monitored over time.
Overall
Overall quality is moderate: the project uses an established CDM methodology and has VVB-confirmed additionality, but multiple evidence gaps and contradictions reduce confidence in the quantified outcomes. For the grid emission factor contradiction (0.90852 vs 908.52), the 0.90852 value is privileged because it is consistent with typical tCO2/MWh magnitudes and comes from the more recent monitoring report (2011), while 908.52 is likely a unit/decimal formatting error in an older monitoring document (2006). For the additionality test contradiction (barrier vs investment), the later validation report (2006-03-22) is privileged as the more recent version, but the inconsistency still indicates documentation reliability issues and is scored down accordingly. For safeguards (mentioned vs not mentioned), the monitoring report (2011) is privileged for reflecting what was actually carried forward into monitoring, but the inconsistency suggests uneven safeguards reporting over time.
Audit Analysis
This is a grid-connected wind project using a recognized CDM methodology (ACM0002) with additionality confirmed by the VVB, and no material findings or corrective actions reported in the extracted record. However, key integrity elements are weakly evidenced in the available documents, especially leakage treatment and baseline reassessment timing, and there are notable internal inconsistencies (e.g., grid emission factor and additionality test type) that increase over-crediting and reliability risk.
Project Description
This wind power project has a total installed capacity of 54.0 MW, consisting of 90 WEGs of 600 kW each (E-40 model). Electricity generated is evacuated through the WWIL sub-station at 132 kV and supplied to RRVPNL under long-term PPAs, with WWIL handling O&M services. The project reduces CO₂ emissions, supports rural elec…
Red Flags
- Leakage is not addressed in the monitoring report and no leakage deduction is stated, creating an evidence gap on a core accounting element.
- Contradictory grid emission factor values (0.90852 vs 908.52) across monitoring reports suggest a unit/decimal error risk that could materially affect credited reductions.
- Additionality test type is inconsistent across validation reports (barrier vs investment), reducing confidence in the additionality narrative.
- Safeguards appear inconsistently documented and FPIC/grievance mechanism are not evidenced in the extracted record.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2008, 2012, 2013 (non verificato).
Cosa migliorerebbe questo punteggio
- Provide the verification/issuance tables showing verified ERs for the monitoring period and reconcile claimed vs verified totals in a single public summary.
- Clarify and correct the grid emission factor (units, source year, and calculation) and publish a reproducible calculation sheet to resolve the 0.90852 vs 908.52 discrepancy.
- Add explicit leakage assessment (even if concluded negligible) with justification consistent with the methodology and monitoring report.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
Avoidance project (no reversal pool needed)
Leakage not addressed
Project-specific; reassessment timing unclear
FPIC/grievance not evidenced
Not CORSIA-eligible; CCP status unclear
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →