Carbon Emission Reduction Program through CCDB Improved Cook Stove (ICS) in Bangladesh – VPA 1 – Patharghata and Morrelganj 1
GS-1658 ↗ · current registry ID: GS7444
#117of 202 in Industrial#10of 10 in Bangladesh#283of 426 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved cook stove project in Bangladesh with VVB-confirmed additionality and a quantified leakage deduction, but undermined by a project-specific baseline, unaddressed permanence/reversal risk, multiple contradictions between the PDD, monitoring report, and verification report, and a low extraction confidence that limits confidence in the extracted record. The absence of verified ERR figures and a verified usage rate further weakens the evidentiary basis for the claimed reductions.
Red Flags
- Eight contradictions between documents, including conflicting FNRB methods (national default vs. local field) and monitoring methods (smart meter vs. annual survey), raising data-reliability concerns
- Reversal/permanence risk explicitly not addressed and no buffer pool percentage stated in any available document
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and key figures (ERR claimed, ERR verified, usage rate verified) could not be confirmed
- Material findings of 3 CARs, 4 CLs, and 1 FAR in the verification report indicate the VVB identified non-trivial issues during verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 2,623 | 2,623 | 0 | |
| 2020 | 3,413 | 3,413 | 0 | |
| 2021 | 10,000 | 5,810 | 4,190 | |
| 2022 | 10,000 | 0 | 10,000 | |
| 2023 | 10,000 | 0 | 10,000 | |
| 2024 | 395 | 0 | 395 | |
| Total | 36,431 | 11,846 | 24,585 |
Risk Indicators
VVB-confirmed
Not addressed, no buffer pool
Quantified at 0.95%
Project-specific, no reassessment date
Confirmed in VR but contradicted in PDD
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →