Vai al contenuto principale
VCS avoidance India Registry: Withdrawn Documentazione completa General Methodology v2.0

Chemical Recovery Project At Satia Industries Ltd. (Sil), Formerly Known As Satia Paper Mills Limited Village Rupana, Punjab

VCS-614 ↗

5.7 / 10
Integrity
5.2
Transparency
5.6
Claim Safety
6.0
Documentation
6.4

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB using a barrier analysis (validation report, 2021).

missing Numerous corrective actions cite inconsistencies in baseline/project emissions and missing MRV details (monitoring report, 2021).

Transparency

verified The VVB is identified (Earthood Services Pvt. Ltd.) and the monitoring period is clearly stated (monitoring report, 2021).

missing Key MRV elements are incomplete/unclear (e.g., missing calibration details, missing linkage between daily/monthly data, and unclear calculation narrative) (monitoring report, 2021).

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (registry extract).

missing Over-crediting risk is elevated by contradictions in ERR figures and by noted inconsistencies between the monitoring report and calculation spreadsheet (monitoring report 2021; monitoring report 2011; validation report 2021).

Documentation

verified A relatively broad document set is available (PDD, monitoring report, validation report, issuance) and extraction confidence is high.

missing The presence of many corrective actions and multiple contradictions across documents suggests documentation quality/control issues (monitoring report, 2021).

Detailed Analysis

Integrity

Additionality appears reasonably supported because the validation report (2021) confirms additionality using a barrier analysis and no material findings are recorded in the extracted record. However, integrity is weakened by extensive corrective actions in the monitoring report (2021), including inconsistent baseline emissions between the monitoring report and the calculation spreadsheet and missing detail on baseline/project/ERR calculation steps. Leakage is not addressed in the extracted record and no leakage deduction is evidenced, creating an integrity gap for a biomass/industrial process project. Baseline approach is project-specific and the timing of any baseline reassessment is not stated in the extracted record.

Transparency

Core identifiers are present (VVB name and monitoring period in the monitoring report, 2021), and claimed and verified ERR match in the most recent extracted values. Transparency is reduced by MRV documentation gaps flagged in the monitoring report (2021), such as missing meter accuracy/calibration certificate references, missing linkage between daily and monthly data, and unclear or inconsistent parameter definitions versus the validated project description. Key quantitative inputs (e.g., grid emission factor details) are not evidenced in the extracted record, limiting independent reproducibility.

Claim Safety

The project is stated as not CORSIA-eligible, which lowers the risk of high-impact aviation claims being made from these credits. Nonetheless, claim safety is moderated by over-crediting risk signals: the monitoring report (2021) flags inconsistencies between baseline emissions in the monitoring report and the spreadsheet and missing calculation narrative, and there are cross-document contradictions in total verified/claimed ERR (117,415 vs 39,031). CCP status is not stated in the extracted record, so buyers cannot rely on CCP screening as a backstop. Leakage treatment is not evidenced, which can further increase perceived over-crediting risk for end users.

Documentation

The extracted record references multiple document types (PDD, monitoring report, validation report, issuance) with a relatively high number of documents used and high extraction confidence, supporting a mid-to-strong documentation score. However, the monitoring report (2021) contains a long list of corrective actions requesting basic evidence (e.g., electricity bills, fuel oil records, soda recovery records, calibration certificates) and clarifications, indicating that key supporting documentation was incomplete or poorly presented at the time of assessment. Contradictions on safeguards/FPIC/benefit sharing across documents also suggest inconsistent documentation practices over time.

Overall

Overall performance is mid-range because additionality is VVB-confirmed (validation report, 2021) and the latest extracted claimed and verified ERR align, but MRV/calculation weaknesses and missing leakage treatment materially increase uncertainty. Contradiction 1 (ERR 117,415 in the validation report, 2021 vs 39,031 in the monitoring report, 2011): I privilege 117,415 as it is the more recent, higher-level consolidation, but the discrepancy suggests period/boundary differences and reduces confidence. Contradictions 2 and 3 (safeguards and grievance mechanism true in monitoring report, 2021 vs false in monitoring report, 2011): I privilege the 2021 statement as the more recent status, but the inconsistency indicates evolving or inconsistently reported social management. Contradiction 4 (benefit sharing true in the PDD, 2009 vs false in monitoring report, 2011): I privilege the monitoring report for what was actually implemented/maintained, and treat this as a delivery gap risk. Contradiction 5 (verified ERR 117,415 in validation report, 2021 vs 39,031 in an earlier 2011 record): I privilege the 2021 figure but apply a penalty for reliability due to unresolved inconsistency. Contradiction 6 (FPIC true in PDD, 2009 vs false in monitoring report, 2011): I privilege the monitoring report as evidence of practice during implementation, which weakens safeguards confidence.

Audit Analysis

The project has VVB-confirmed additionality and matching claimed vs verified reductions in the most recent extracted record, but integrity is weakened by major MRV and calculation issues flagged as corrective actions. Leakage treatment and baseline reassessment timing are not evidenced in the extracted record, and several cross-document contradictions reduce confidence in the underlying data.

Project Description

This project recovers caustic soda from waste liquor generated during paper manufacturing, reducing greenhouse gas emissions by using less electricity than producing fresh soda. Electricity for the project is generated in-house from a biomass-based power project.

Red Flags

  • Monitoring/verification issues include missing calibration certificates, inconsistent baseline emissions between the monitoring report and spreadsheet, and missing detail on the emissions calculation process (monitoring report, 2021).
  • Leakage is not addressed and no leakage deduction is evidenced in the extracted record, despite a biomass/industrial fuel-switching context where leakage can be relevant.
  • Contradictory ERR totals across documents (117,415 vs 39,031) indicate potential reporting/period-boundary confusion and reduce reliability.

Credit Vintages

Issued Retired Available
2006
9,108 0 9,108
2008
39,031 39,031 0
2010
7,442 7,442 0
2011
22,357 22,357 0
2012
22,091 22,091 0
2013
18,784 18,784 0
2014
21,448 21,448 0
2015
20,002 20,002 0
2016
5,291 5,291 0
Total 165,554 156,446 9,108

Cosa migliorerebbe questo punteggio

  • Publish a clear, reconciled ERR table by monitoring period showing how 39,031 and 117,415 relate (period boundaries, inclusions/exclusions) and align it with issuance records.
  • Provide complete MRV evidence packs (calibration certificates with IDs, meter accuracy classes, raw daily data with traceable aggregation to monthly totals, and a step-by-step baseline/project emissions calculation narrative) and explicitly quantify/justify leakage (including any deduction).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed barrier analysis

Permanence

Avoidance project; reversal/buffer not evidenced

Leakage

Leakage not addressed

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/grievance inconsistently documented

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti